Laserfiche WebLink
! • <br /> SCOPE OF WORK FOR MONITORING WELL ABANDONMENT <br /> 1. Measure well depth and size of pipe <br /> 2. Lower one inch PVC pipe to the bottom of the well casing and blow out <br /> sediment with air compressor <br /> 3. Fill well casing with concrete grout, pressurized for 5 minutes <br /> 4. Dig down three to five feet, by hand and cut PVC well casing and pour <br /> concrete cap on top <br /> 5. Backfill hole with dirt to grade and compact dirt <br /> 6. Clean up area to complete job <br />