My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SPRECKELS
>
18800
>
2900 - Site Mitigation Program
>
PR0009289
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 2:24:08 PM
Creation date
5/13/2020 1:50:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009289
PE
2960
FACILITY_ID
FA0004043
FACILITY_NAME
SPRECKLES BUSINESS PARK
STREET_NUMBER
18800
Direction
S
STREET_NAME
SPRECKELS
STREET_TYPE
RD
City
MANTECA
Zip
95336
CURRENT_STATUS
02
SITE_LOCATION
18800 S SPRECKELS RD
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KEEL N FELDER <br /> glass sample ampoule. The vacuum in the sample ampoule draws groundwater through the tip <br /> into the glass ampoule. The glass ampoule is then pulled out of the pipe, disengaging the <br /> syringe. The septum in the glass ampoule and drive tip reseals after the syringe is removed. <br /> To reduce the potential for introducing contaminants into the samples, the drive tip, galvanized <br /> pipe, and other equipment used for sample collection are steam cleaned and/or washed with <br /> trisodium phosphate (TSP) or non-phosphate detergent solution and double rinsed with distilled <br /> water prior to use. The sample probe and filters are cleaned in TSP solution and rinsed with <br /> methyl alcohol followed by a distilled water rinse prior to use. New, factory-sterilized syringe <br /> needles, O-rings, septum's and sample tubes are used for each sample. <br /> A-2.6 Sample Handling <br /> After labeling, the sample is immediately stored in an iced cooler for transport to Kleinfelder's <br /> office sample control or to the analytical laboratory. A Kleinfelder chain-of-custody form <br /> accompanies the cooler. The chain-of-custody form includes Kleinfelder's name, address and <br /> telephone number, the employee number of the individual who performed the sampling, the <br /> sample numbers, the date and time the samples were collected, the number of containers each <br /> sample occupies, the sample matrix (soil or water) and the analyses for which the samples are <br /> being submitted, if any. The chain-of-custody form is signed by each person who handles the <br /> samples, including all Kleinfelder employees and the receiving employee of office sample <br /> control or the analytical laboratory when the samples are delivered. <br /> A-2.7 Decontamination of Equipment <br /> To reduce the potential for cross-contamination, augers and associated equipment are steam <br /> cleaned prior to drilling each boring. In addition, sampling equipment is cleaned with a <br /> trisodium phosphate or non-phosphate detergent wash and rinsed with distilled water prior to <br /> collecting each soil sample. <br /> A-2.8 Soil Boring Closure and Cutting Disposal <br /> Soil borings are closed immediately after the collection and logging of soil samples. Closure is <br /> accomplished by grouting the boring with a bentonite/cement slurry, or as otherwise required. <br /> Drill cuttings will be placed in 55-gallon drums, wrapped in plastic, or spread around the boring <br /> and left on site for disposal by the site owner. If requested, Kleinfelder can coordinate disposal <br /> of soil and water after analytical results are available. <br /> 20-YPO-273/2000P331/200OW034 Page A-3 <br /> Copyright 2000, Kleinfelder,Inc. September 4,2000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.