Laserfiche WebLink
KLEINFELDER <br /> 4.5 Collection of Groundwater Samples <br /> The wells will not be sampled for chemical analysis after development. Rather, wells MW-Ir <br /> and MW-2r will be replacing wells MW-1 and MW-2 in the routine groundwater monitoring at <br /> the site. <br /> 4.6 Report Preparation <br /> Upon completion of field activities, a report will be prepared for client review. The report will <br /> include: <br /> • A description of field activities, observations, and protocols; <br /> • Lithologic logs; <br /> • Description and documentation of QA/QC procedures employed for field and laboratory <br /> work; and; <br /> • An assessment of the results, with conclusions and recommendations. <br /> All information gathered during the study by Kleinfelder is considered confidential and will be <br /> released only upon written authorization from the client or as required by law. California law <br /> requires a person to inform the State if a situation is encountered that can be considered an <br /> immediate endangerment to the public's health or welfare and/or to the environment. <br /> 5.0 SCHEDULE <br /> Kleinfelder could initiate drilling activities within approximately 5 to 10 working days of <br /> receiving written authorization to proceed by the client, PHS/EHD and the CVRWQCB, <br /> depending on subcontractor availability. Our report of the initial monitoring well installations <br /> will be submitted for client review within approximately 20 working days following field <br /> activities. The estimated completion time for all of the tasks outlined in this proposal through <br /> submittal of the report to the client is approximately 4 to 7 weeks from approval by the client and <br /> the two agencies noted above. <br /> 6.0 CLIENT RESPONSIBILITIES AND ASSUMPTIONS <br /> This workplan/proposal is based on the following assumptions: <br /> > Atherton Kirk Development will provide all site access for the drilling, well installation, <br /> subsequent monitoring and eventual well destruction. <br /> > Adequate workspace and access will be provided. Kleinfelder will attempt to install the <br /> monitoring wells and collect samples at the proposed locations. If the drilling equipment <br /> 20-YPO-273/2000P331/2000W034 Page 8 of 1 I <br /> Copyright 2000, Kleinfelder,Inc. September 4,2000 <br />