My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SEQUOIA
>
500
>
2900 - Site Mitigation Program
>
PR0505768
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 9:40:24 AM
Creation date
5/13/2020 2:04:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505768
PE
2960
FACILITY_ID
FA0006988
FACILITY_NAME
ALDEN PARK CHEVRON
STREET_NUMBER
500
Direction
N
STREET_NAME
SEQUOIA
STREET_TYPE
AVE
City
TRACY
Zip
95376
APN
23416001
CURRENT_STATUS
01
SITE_LOCATION
500 N SEQUOIA AVE
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\fgarciaruiz
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
462
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 • A <br /> WO Chevron <br /> December 6, 1996 <br /> Chevron Pipe Line Company <br /> 4000 Executive Parkway.Suite 400 <br /> San Ramon,CA 94583 <br /> P0.Box 5059 <br /> Mr. Joel Weiss San Ramon,CA 94583-0959 <br /> Engineering Geologist <br /> California Regional Water Quality Control Board <br /> Central Valley Region <br /> 3443 Routier Road, Suite A <br /> Sacramento, California 95827-3098 <br /> Pilot Separate-Phase Oil Removal Program <br /> Alden Park Site <br /> Tracy, California <br /> Dear Mr. Weiss: <br /> Please find attached the Pilot Separate-Phase Oil Removal Program for the subject site, dated <br /> December 6, 1996. The removal program was conducted on behalf of Chevron Pipe Line <br /> Company (CPL)by Geomatrix Consultants Inc. The results indicate that separate-phase material <br /> can be removed from several of the groundwater monitoring wells with a vacuum truck. <br /> Removal of separate-phase material with a vacuum truck will continue as an interim remedial <br /> measure. Additionally, CPL will evaluate the economics of different technologies that may be <br /> utilized to remove separate-phase material on a long term basis. Please contact Mr. Martin Bloes <br /> (510/842-6855) or me (510/842-6877) with any remarks or questions. <br /> Sincerely, <br /> . L. Hower <br /> roject Manager <br /> California Site Remediation <br /> cc: <br /> Jill Jefferson -Geomatrix Consultants <br /> Michael Infuma- San Joaquin County Public Health Services <br /> Pat Hughes- Chevron Research and Technology Company <br />
The URL can be used to link to this page
Your browser does not support the video tag.