Laserfiche WebLink
C • PFTF <br /> CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD- <br /> CENTRAL VALLEY REGION <br /> 3443 Routier Road, Suite A a <br /> Sacramento, CA 95827-3098 <br /> PHONE: (916) 255-3000 <br /> FAX: (916) 255-3015 <br /> 21 December 1993 <br /> Mr. Pat Hughes <br /> Chevron Research and Technology Co. <br /> P.O. Box 4054 <br /> Richmond, CA 94804-0054 <br /> CHEVRON PIPE LINE COMPANY, ALDEN PARK SITE, TRACY, SAN JOAQUIN <br /> COUNTY <br /> We have received your 30 November 1993 letter which contains the ground water sampling and <br /> analysis plan for the above referenced site. We approve this sampling plan as submitted. As <br /> discussed earlier, we would like to be present to observe sampling procedures and split samples, so <br /> please contact us at least 72 hours prior to sampling to confirm the date and time. <br /> If you have any questions, please call me at (916) 255-3054. <br /> DAVID E.JJENKINS <br /> Associate Engineering Geologist <br /> DEJ:ldj <br /> cc: Ms. Megan Cambridge, Department of Toxic Substances Control, Region 1, Sacramento <br /> Ms. Margaret Lagorio, San Joaquin Public Health Services, Stockton <br /> Mr. Bill Vizza, Director, Department of Public Works, Tracy <br /> Ms. Susan A. Robinson, Chevron Pipe Line Company, San Ramon <br /> o 5 <br /> N r rmj <br /> N <br /> un `t <br />