My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SEQUOIA
>
500
>
2900 - Site Mitigation Program
>
PR0505768
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 9:40:24 AM
Creation date
5/13/2020 2:04:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505768
PE
2960
FACILITY_ID
FA0006988
FACILITY_NAME
ALDEN PARK CHEVRON
STREET_NUMBER
500
Direction
N
STREET_NAME
SEQUOIA
STREET_TYPE
AVE
City
TRACY
Zip
95376
APN
23416001
CURRENT_STATUS
01
SITE_LOCATION
500 N SEQUOIA AVE
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\fgarciaruiz
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
462
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wendy L. Cohen -3- 24 September 1993 <br /> approximately 0.003 gpm. D&M concluded "potential recovery rates may be effectively evaluated <br /> using relatively simple equipment and techniques." No further work has been done to clean up the <br /> floating oil on the ground water. <br /> In addition to the liquid hydrocarbon recovery evaluation, in the summer of 1988 Chevron began <br /> conducting a bioventing test to determine if the technology would be useful in mitigating the <br /> hydrocarbon problem. In a letter dated 11 February 1993 from Ms. Susan A. Robinson with <br /> Chevron, she said they were currently assessing the performance of the bioventing system operating <br /> in the park and although it has been somewhat successful at biodegrading a portion of the oil its <br /> performance has not been encouraging. She also stated that they would continue to operate the <br /> bioventing system to collect further data to evaluate its effectiveness. I think five years is a <br /> sufficient amount of time to evaluate a bioventing test and Chevron should move ahead in mitigating <br /> the hydrocarbon problem at this site. <br /> In reviewing this site, I had discussions with Mr. Chris Mina, an engineer with the City of Tracy <br /> and Ms. Megan Cambridge and Ms. Chris Parent both with the Department of Toxic Substances <br /> Control. All of these people were interested in the cleanup of this site. In addition, I had a phone <br /> conversation with Mr. Pat Hughes of Chevron discussing the site and their plans. Mr. Hughes said <br /> they plan to do the annual ground water sampling in September and would schedule a meeting with <br /> us in October to discuss the site and propose ideas to remediate the contamination. Mr. Hughes also <br /> proposed performing a risk assessment. <br /> At this point, I think it is important for Chevron Pipe Line Co. to proceed and remediate the <br /> contamination at this site. They need to expand the bioventing system to clean up the entire site, or <br /> propose other cleanup methods. Also, immediate action should be taken to initiate liquid <br /> hydrocarbon recovery beginning with those monitoring wells that contain free product. <br /> DFJ:gs <br /> I <br /> i <br /> I <br /> A <br />
The URL can be used to link to this page
Your browser does not support the video tag.