My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SEQUOIA
>
500
>
2900 - Site Mitigation Program
>
PR0505768
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 9:40:24 AM
Creation date
5/13/2020 2:04:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505768
PE
2960
FACILITY_ID
FA0006988
FACILITY_NAME
ALDEN PARK CHEVRON
STREET_NUMBER
500
Direction
N
STREET_NAME
SEQUOIA
STREET_TYPE
AVE
City
TRACY
Zip
95376
APN
23416001
CURRENT_STATUS
01
SITE_LOCATION
500 N SEQUOIA AVE
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\fgarciaruiz
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
462
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr . David L. Brent -2- July 13 , 1988 <br /> The tests will allow us to determine what flow rates may be sus- <br /> tained and what water removal rates are required. We will also <br /> gather information about carbon dioxide and hydrocarbon levels in <br /> the vent gas under sustained high flow conditions, and may be <br /> able to measure the reach of the well . All of this information <br /> is needed to design a continuous test at the higher vacuums and <br /> determine if that test would be useful. <br /> If the eight-hour high vacuum tests indicate venting may be fea- <br /> sible at Tracy, the longer term high vacuum testing (and water <br /> removal) may be proposed. In that case, we would submit a <br /> specific proposal and ask for an appropriate extension to the <br /> approved test period. <br /> The eight-hour tests will be run during the daytime with Chevron <br /> personnel onsite at all times, and all water removed from the <br /> well will be treated at a Chevron facility. (We anticipate <br /> 0 . 5-10 gpm of water will be removed during each test. ) We will <br /> review with the City of Tracy our plans for additional equipment <br /> for the test, and intend to carry out the tests within the con- <br /> ditions specified in our existing permits. <br /> We plan to run the eight„-hour tests in late July, and we intend <br /> for this letter to serve as a formal addition to our work plan. <br /> If you have any questions about the testing or water removal, <br /> please contact me at ( 415) 620-3171 . <br /> Very truly yours, <br /> D. L. Ely <br /> Encl . - Time Line <br /> cc: Mr . Craig L. Phillips <br /> Mr . Charles McLaughlin <br /> Mr . David R. Carls <br />
The URL can be used to link to this page
Your browser does not support the video tag.