My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SEQUOIA
>
500
>
2900 - Site Mitigation Program
>
PR0505768
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 9:40:24 AM
Creation date
5/13/2020 2:04:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505768
PE
2960
FACILITY_ID
FA0006988
FACILITY_NAME
ALDEN PARK CHEVRON
STREET_NUMBER
500
Direction
N
STREET_NAME
SEQUOIA
STREET_TYPE
AVE
City
TRACY
Zip
95376
APN
23416001
CURRENT_STATUS
01
SITE_LOCATION
500 N SEQUOIA AVE
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\fgarciaruiz
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
462
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • Page 3 of 5 <br /> Any way you can "in-a-nutshell" this system for me? Like a simple <br /> line-diagram showing piping size and length and maybe the other <br /> well heads on this trunk line? <br /> Will taking out this vapor well you propose allow the other <br /> vapor/vent wells to still operate.? If so, and the vacuum line from <br /> the unit still needs to be connected to the other wells, can you do it <br /> that way? If so, then we may NOT have to destroy any horizontal <br /> lines. <br /> I only want the feed/trunk/supply line removed IF it only goes to <br /> this well. If it feeds other wells and you still are using or PLAN TO <br /> USE the other wells, it may stay in place. Just block off the <br /> attachment/open line to the well we plan on destroying.. <br /> see? <br /> Your first pic has me asking more questions than you hoped it <br /> would answer. What is that black piping entering/exiting the box in <br /> the upper right side of the pic? Is the piping existing/entering from <br /> the lower right going TO the unit or TO another well head? Can you <br /> explain ALL the piping/hookups here? <br /> try faxing me a line diagram of the system...simple drawing...show <br /> well heads....show feed line, show pipe size please, a dimension or <br /> two of distance to the unit from the well, etc...no big engineered <br /> drawing, just a figure/note between you and me...help me see if <br /> horizontal lines need to be destroyed/removed.. <br /> -----Original Message----- <br /> From: ROGER.K.HOFFMORE@saic.com [mailto:ROGER.K.HOFFMORE@saic.com] <br /> Sent: Wednesday, March 29, 2006 2:32 PM <br /> To: Mike Infurna [EH] <br /> Subject: RE: permit for Alden Park,Tracy -well destructions <br /> Should I divorce this well from the other 4 and resubmit two separate applications? <br /> Roger Hoffmore <br /> SAIL, Sacramento Office <br /> hoffmorer(c)saic.com <br /> office: 916-979-3814 <br /> From: Hoffmore, Roger K <br /> Sent: Wednesday, March 29, 2006 2:28 PM <br /> To: 'Mike Infurna [EH]' <br /> Cc: C. Dean Hubbard (hubbardd@rb5f.swrcb.ca.gov); Jenkins, Michael E. <br /> Subject: RE: permit for Alden Park,Tracy -well destructions <br /> Mike, <br /> Attached is a couple of recent photos (3/24/06) of the inside of the vacuum well vault. <br /> The piping/equipment/vault will all be removed prior to the well destruction - that <br /> work is scheduled to begin April 24. There is no other known well connected to the <br /> piping. <br /> Regards, <br /> 4/3/2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.