My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SEQUOIA
>
500
>
2900 - Site Mitigation Program
>
PR0505768
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 9:40:24 AM
Creation date
5/13/2020 2:04:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0505768
PE
2960
FACILITY_ID
FA0006988
FACILITY_NAME
ALDEN PARK CHEVRON
STREET_NUMBER
500
Direction
N
STREET_NAME
SEQUOIA
STREET_TYPE
AVE
City
TRACY
Zip
95376
APN
23416001
CURRENT_STATUS
01
SITE_LOCATION
500 N SEQUOIA AVE
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\fgarciaruiz
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
462
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y' M • • <br /> Common <br /> too Chevron <br /> Ou 11/: 04 Chevron Environmental Management <br /> September 28, 2000 Company <br /> 6001 Bollinger Canyon Road <br /> P.0.Box 6012 <br /> San Ramon,CA 94583-0712 <br /> MI. Zabi Zaka Robert D.Mihalovich <br /> Pipeline Program Manager <br /> City of Tracy Phone:(925)842-1341 <br /> Department of Development and Engineering Services Facsimile:(925)842-0213 <br /> 520 South Tracy Boulevard <br /> Tracy, California <br /> Potential Hydrocarbon Affected Soil <br /> Alden Neighborhood Park Playground Renovation <br /> CIP No. 7805 <br /> Tracy, California <br /> Dear Mr. Zaka: <br /> Chevron Environmental Management Company(Chevron) has reviewed the drawings, <br /> specifications, and contract documents for the City of Tracy's Alden Neighborhood Park <br /> Playground Renovation (herein referred to as "the project"). Based on review of these <br /> documents, Chevron anticipates that the City of Tracy's contractor may encounter petroleum <br /> hydrocarbon affected soil during project construction activities. <br /> As you are aware, Alden Neighborhood Park is situated directly over the site of a historical <br /> reservoir that contained Bunker C fuel oil. Chevron initiated an assessment of subsurface <br /> conditions in 1986. This investigation was completed in 1996. Subsequently, a health risk <br /> assessment (HRA) was performed to evaluate the potential human health risks associated with <br /> the presence of chemicals in the subsurface. The Department of Toxic Substances and Control <br /> reviewed this study and concurred that residual petroleum hydrocarbons in soil are below <br /> concentrations that would constitute an unacceptable risk to human health or the environment. <br /> Enclosed is a copy of the soil management plan for the Alden Park site. This document is <br /> intended as a guideline for the handling, reuse, and disposal of soil affected by residual Bunker C <br /> fuel oil that may be encountered during project construction activities. <br /> Chevron requests to be informed when the contractor for the project has been selected and to be <br /> provided with the selected bidder's contact information. In addition, Chevron requests to be <br /> notified of future City of Tracy projects within the Alden Neighborhood Park area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.