My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SEQUOIA
>
500
>
2900 - Site Mitigation Program
>
PR0505768
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 2:53:39 PM
Creation date
5/13/2020 2:07:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505768
PE
2960
FACILITY_ID
FA0006988
FACILITY_NAME
ALDEN PARK CHEVRON
STREET_NUMBER
500
Direction
N
STREET_NAME
SEQUOIA
STREET_TYPE
AVE
City
TRACY
Zip
95376
APN
23416001
CURRENT_STATUS
01
SITE_LOCATION
500 N SEQUOIA AVE
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To Alden Park Homeowner -2- December 2, 1987 <br /> The two technologies we have selected are liquid oil recovery via pumping and in <br /> situ (in place) b!oventing which speeds up the natural biodegradation of the oil. We <br /> will advise you how successful these field tests are in future newsletters. In <br /> addition, we plan to permanently remove surface oil seeps and plant several new <br /> trees in Alden Park. Our studies to date suggest that the combination of the <br /> concrete floor and oily dirt may be restricting the growth of some trees in the <br /> park. Our scientists have designed special containers for planting the trees to <br /> solve these potential problems. <br /> Future Alden Park Activities <br /> Over the next severa! months, you will see various activities in and around the <br /> park. We will continue to work closely with the city and agencies to obtain <br /> approvals and permits to perform the work. These activities include: <br /> 1) Excavation of surface oil seeps. <br /> 2) Planting of six trees in special containers in Alden Park. <br /> 3) A liquid oil pumping field test in the park. You will see a <br /> small trailer which contains the pumping equipment in the <br /> northeast corner of the park for one to two weeks. <br /> 4) A bioventing field test which will be conducted in the <br /> northern area of the park. This test will last up to ten weeks, <br /> then the temporary facilities will be removed. <br /> Neighborhood Slide Show Presentations <br /> We have prepared a slide show presentation detailing the above information which <br /> we will show to interested neighborhoods. If you and your neighbors would like for <br /> us to come to one of your homes to make this presentation, please call me collect <br /> at (415) 894-9320 to arrange a time. Also, don't hesitate to call collect anytime <br /> you have any questions. <br /> Please have a safe and happy holiday season! <br /> Very truly yours, <br /> 14 <br /> Mary E. Metcalf <br /> Coordinator - Environmental, <br /> Safety, Fire and Health <br /> MEM:jgs/b <br /> cc: Tracy, City Manager, Michael Locke <br /> Department of Health Services - Chuck McLaughlin <br /> Regional Water Quality Control Board - David Brent <br /> Local County Health - Dave Carls, Seyed Sadredin <br />
The URL can be used to link to this page
Your browser does not support the video tag.