Laserfiche WebLink
FIGURE 2: MODIFIED BIOVENTING WELL NOTES: <br /> ALDEN PARK MITIGATION: PHASE I <br /> 1. NEW EQUIPMENT. <br /> GROUND <br /> 40 <br /> COMPRESSED AIR TO PUMP (NOTE 1) <br /> OILY WATER TO TREATMENT (NOTE 1) <br /> VAULT / <br /> _ VENT GAS TO <br /> DEPTH VACUUM PUMP <br /> 3'-3" <br /> E2" WELL <br /> ELL SEAL <br /> 4._B. <br /> K <br /> AIR FLOW ° AIR FLOW <br /> THROUGH SOIL aQ �QSING THROUGH SOIL <br /> a" <br /> aQ a0 <br /> WATER • <br /> o o . <br /> TABLE <br /> e0 oQ. — <br /> n0 nO <br /> aQ. o -----SUBMERGED PUMP <br /> ° - (NOTE 1) <br /> aQ. oQ. <br /> n. e <br /> e Q.o O.oQ.oQ. <br /> 4-26-88 <br /> DHM/5382 <br />