Laserfiche WebLink
' Mr. Lee Higgins-CEMC <br /> Annual 2010 Groundwater Monitoring and Sampling Report April 19, 2010 <br /> Alden Park Page 7 of 7 <br /> 1 <br /> CLOSING <br /> ' If you have any questions regarding this report, please call Caryl Sheehan at(916) 979- <br /> 3836. <br /> ' Sincerely, <br /> The Benham Companies, LLC, an SAIC Company <br /> 1 <br /> Andrew Smith aryl Sb4han P.G. 6620 <br /> Project Geologist Princip eologistNAS-GSC <br /> opo <br /> W ML Fl <br /> ' 4 SIA4MV _ <br /> WHO.. <br /> ' Enclosures: <br /> Figure 1. Vicinity Map <br /> Figure 2. Site Map OF'CP <br /> ' Figure 3. Potentiometric Surface <br /> Figure 4. Petroleum Hydrocarbon Distribution in Groundwater January 6-7, 2010 <br /> Table 1. Water-Level Elevation Data <br /> Table 2. Groundwater Analytical Results.(TPH and BTEX) <br /> ' Table 3. Groundwater Analytical Results (PAHs) <br /> Table 4. Summary of SPO Extracted <br /> Table 5. Summary of Groundwater Flow Directions and Gradients <br /> ' Table 6. Summary of Well Construction Details <br /> Attachment A.References for Previous Environmental Investigations <br /> Attachment B.Field Sheets <br /> ' Attachment C.Data Usability Summary and Laboratory Analytical Reports <br /> i <br /> i <br /> 1 <br /> I <br /> i <br />. 1 <br /> I 1 <br />