My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020 (2)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
3437
>
2200 - Hazardous Waste Program
>
PR0505939
>
COMPLIANCE INFO_2020 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2020 11:21:41 AM
Creation date
5/13/2020 3:01:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0505939
PE
2249
FACILITY_ID
FA0007094
FACILITY_NAME
APPLIED AEROSPACE STRUCTURES CORP
STREET_NUMBER
3437
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17702033
CURRENT_STATUS
01
SITE_LOCATION
3437 S AIRPORT WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOURCE REDUCTION MEASURES AND EVALUATION <br /> Wastewater treatment <br /> 1 . Input changes — Wastewater is treated to remove chromium . All processes which <br /> contribute to the waste stream contain chromium . Since most of the processes we <br /> use are driven by the customer, it is difficult to find alternatives . Boeing specifies <br /> a chromated conversion coating process . There are no non- chromated alternatives <br /> currently available . They are investigating alternatives , however, actual use may <br /> still be years away . The air scrubber water is generated from the exhaust over the <br /> heated deoxidizes solution which contains a sodium dichromate and sulfuric acid <br /> solution . A non-chromated process is available (Phosphoric Acid Deox — PAD) , <br /> however, it is not widely accepted by our current customers . This was reviewed <br /> in our initial SB 14 submission in 1990 . The sump waste water is a result of <br /> carryover, overspray and cleaning the process areas that use chromium containing <br /> materials . <br /> 2 . Operational improvement — Overspray occurs when rinsing parts coming out of <br /> the tanks . In an effort to prevent overspray from accumulating on the pit floor, a <br /> wall with rain gutters was built and placed on the south side of the cleaning center <br /> tanks so overspray returns back to the tank, reducing the amount requiring <br /> treatment . <br /> 3 . Production process changes — None . Processes are customer driven . <br /> 4 . Product reformulation — N/A . <br /> 5 . Administrative steps — Annual Hazardous Waste Management training is <br /> conducted to minimize and prevent the generation of hazardous waste . <br /> Graphite Pre-preg <br /> 1 . Input changes — None . Use of the material is customer driven . <br /> 2 . Operational improvements — Certain materials were tested to determine if they <br /> were actually hazardous waste . Results indicated that some were non-hazardous <br /> waste . Signs were created indicating which materials are non-hazardous and <br /> therefore able to be put into the regular trash and not collected and disposed of as <br /> a hazardous waste . <br /> 3 . Production process changes — Material is automatically cut to size using a ply <br /> cutter. It maximizes use of the material . <br /> 4 . Product reformulations — N/A . <br /> 6 . Administrative steps — Inventory control — It is difficult to keep off- spec material <br /> or excess material from our inventory . In many instances , there are minimum buy <br /> requirements . In some cases , if we run out of material , the lead time for getting <br /> additional material could be up to 6 months and this interferes with our ability to <br /> complete the job on time . Annual Hazardous Waste Management training is <br /> conducted to prevent the generation of hazardous waste . <br /> Phosphoric acid anodize solution (FPL etch process) <br />
The URL can be used to link to this page
Your browser does not support the video tag.