My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
2245
>
2900 - Site Mitigation Program
>
PR0540822
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2021 3:30:30 PM
Creation date
5/13/2020 3:05:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0540822
PE
2960
FACILITY_ID
FA0023389
FACILITY_NAME
FORMER HELENA CHEMICAL FACILITY
STREET_NUMBER
2245
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16336017
CURRENT_STATUS
01
SITE_LOCATION
2245 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Addendum to Revised Work Plan for Additional Site Investigation <br /> Former Helena Chemical Facility <br /> January 29,2019 <br /> Page 2 <br /> This Addendum describes three additional step-out borings to delineate the extent of 1,2,3-TCP and nitrate <br /> impacts on the northern boundary of the Site. One boring (1348) will be drilled on Site, northeast of <br /> monitoring well MW-5, along the northern boundary of the property line, and two borings (1349 and B50) <br /> are proposed on the adjacent property to the north(Highland Wholesale Foods).The proposed locations are <br /> presented on Figure 4, attached. Condor anticipates that a monitoring well will also be installed near <br /> proposed boring B48 to delineate the eastern extent of the dissolved 1,2,3-TCP and nitrate-N in <br /> groundwater. <br /> Drilling, sampling, and well installation will follow the procedures documented in the Work Plan. Soil <br /> samples will be collected from approximate depths of 5, 10, 15, and 30 feet below ground surface (bgs) <br /> from each proposed boring and groundwater samples will be collected at depths of approximately 15 and <br /> 30 feet bgs. Soil and groundwater samples will be analyzed for the presence of 1,2,3-TCP and nitrate-N by <br /> the analytical methods cited in the Work Plan. The additional groundwater monitoring well, if warranted, <br /> would be installed approximately 15 to 30 days after the initial borings are drilled and sampled, once <br /> analytical results are available,to evaluate the appropriate placement to delineate the groundwater plumes. <br /> Any additional monitoring well will be constructed as described in the Work Plan. A report summarizing <br /> the drilling activities, results,and recommendations, as appropriate, will be prepared and submitted to the <br /> Central Valley Water Board. <br /> Please contact me at jlaneAcondorearth.com or (209) 938-1061 if you have any questions regarding this <br /> submittal. <br /> Respectfully submitted, <br /> 14AL <br /> CONDOR EARTH ��`°5�,N PC,gcO�p <br /> a. <br /> N0.8795 <br /> OF Gam\Fn <br /> John P. Lane, PG 6795 January 29,2019 <br /> Environmental Services Manager <br /> Attachments: <br /> Figure 1 —Vicinity Map <br /> Figure 2—Site Map Showing Site Features and Sample Locations of Initial Investigations <br /> Figure 3—Site Map Showing Sample Locations 2013 Through 2018 <br /> Figure 4—Proposed Step-Out Boring Locations Based on Recent Groundwater Sampling <br /> cc: Beverly Garcia, Raymond Investments Corporation <br /> Scott Malm,Malm Fagundes LLP <br /> XAPraject\6000_prj\6847 Raymond Investments-Helena Chemical\Reports\Letter Addendum Jan 2019\171,20190129_6847A Addendum.docx <br /> �i� CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.