My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
2245
>
2900 - Site Mitigation Program
>
PR0540822
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2021 3:30:30 PM
Creation date
5/13/2020 3:05:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0540822
PE
2960
FACILITY_ID
FA0023389
FACILITY_NAME
FORMER HELENA CHEMICAL FACILITY
STREET_NUMBER
2245
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16336017
CURRENT_STATUS
01
SITE_LOCATION
2245 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE MITIGATION PROGRAM CHECKLIST <br />SITE LOCATION: ii..5- it1/4.i C4+6./V,-) ‘a_ FA#: D 0 7.-Wcci PR# 059 I) <br />DATE ACTIVITY INITIAL <br />Review submittal and make sure all documents/fees have been submitted. <br />Request documents/fees not submitted. <br />ci, / <br />il <br />' <br />Provide MFR to Accounting to ensure project has a FA# and a PR#. The PR# for a <br />agency changes, a new PR# must be created under project does not change. If the lead <br />the existing FA. <br />(si ll, <br />Issue SR for Work Plan Review - Enter the data into the SR form in EC making sure <br />on the permit form. If <br />on a golden rod Service <br />obtaining documents/ <br />work activities, reviewing L ---)( <br />to link the SR to the related FA. Generate an SR# and document <br />no permit form has been submitted, record the information <br />Request form. Use this SR# on your DAR to track time spent <br />fees, reviewing work plan, issuing permits, coordinating field <br />subsequent report/sample results, making notifications/referrals. <br />(e11> Work Plan SR#: 00 -79 24ç L ..,r <br />tP i I - <br />Review Work Plan to ensure scope of work matches the scope of work approved by <br />construction/destruction meets SJC Ordinance Code k.._ --71( the lead agency and that the mw <br />and well standards. <br />(.0 i 7- <br />/ 1> <br />Issue Permits - Enter permit information into WP form in EC, link to the FA# for the <br />WP# on DAR to track time spent in the field for the <br />on the permit. <br />L--X project, and obtain a WP#. Use this <br />specific mw/boring activity specified <br />(0 / 7- <br />/ 1> WP#: <br />00 31SHI.Li Scope: ---, c.- LK <br />tvi t c WP#: <br />0 kYY36t*2-k, <br />2 Scop/ <br />.7 <br />WP#: Scope: <br />WP#: Scope: <br />WP#: Scope: <br />After scope of work on the well and boring permit WPs are complete, update the <br />following fields in the Well Permit Approval Dates section of the WP form in EC: Plan <br />Status - choose 'Finaled'; Final Inspection - enter date permit finaled. <br />After all field work is complete, flag calendar to follow up on report of findings. <br />Report Review: <br />Projects -Review report to determine if <br />present, print out a 5021 and request a <br />2960. Provide 5021 to Accounting Office for <br />65 Notification. Send notification letter to CVRWQCB. <br />-Review report to determine next phase of work to <br />appropriate. Complete Prop 65 for any new <br />-Review report to determine if any immediate public <br />health concerns are found, notify supervisor <br />further notifications. Complete Prop 65 for any new <br />Environmental Assessment <br />contamination was found. If contamination <br />new PR# be issued under PE <br />processing. Complete a Prop <br />EHD Lead Oversight Projects <br />be conducted or if closure is <br />contaminants found at the site. <br />Other Lead Agency Projects <br />health issues are found. If public <br />immediately for follow up and <br />contaminants found at the site. <br />After scope of work for the project SR is complete, update the following fields in the <br />Service Request Approval Dates section of the SR form in EC: Plan Status - choose <br />'Finaled'; Final Inspection - enter date work finalized. <br />EHD-29 8/15/17 <br /> <br />Site Mitigation Program Checklist
The URL can be used to link to this page
Your browser does not support the video tag.