Laserfiche WebLink
TABLE OF CONTENTS <br />1.0 INTRODUCTION 1 <br />2.0 SITE SETTING 1 <br />3.0 PROJECT BACKGROUND 2 <br />4.0 SENSITIVE RECEPTOR SURVEY 3 <br />4.1 WELLS WITHIN 1,000 FEET OF THE SITE 3 <br />4.1.1 Department of Water Resources 3 <br />4.1.2 Other Sources 4 <br />4.2 WELLS WITHIN 500 FEET OF THE SITE 4 <br />4.3 OTHER POTENTIAL RECEPTORS 4 <br />4.3.1 Schools and Childcare Facilities 4 <br />4.3.2 Surface Water Bodies 4 <br />4.3.3 Healthcare Facilities 5 <br />4.3.4 Parks 5 <br />4.4 PUBLIC WATER SUPPLY 5 <br />5.0 PROPOSED SCOPE OF WORK 5 <br />5.1 SITE PREPARATION 5 <br />5.2 SAMPLE LOCATIONS AND RATIONALE 6 <br />5.2.1 Proposed Borings Near Northern Property Boundary 6 <br />5.2.2 Proposed Borings Near Well MW-3 6 <br />5.2.3 Proposed Monitoring Wells 7 <br />5.3 SOIL BORING DRILLING AND SAMPLING METHODOLOGY 7 <br />5.4 "GRAB" GROUNDWATER SAMPLING METHODOLOGY 7 <br />5.5 MONITORING WELL DRILLING AND INSTALLATION 8 <br />5.6 FIELD QUALITY ASSURANCE QUALITY CONTROL 8 <br />5.7 MONITORING WELL SURVEYING 9 <br />5.8 GROUNDWATER MONITORING WELL DEVELOPMENT 9 <br />5.9 SOIL AND GROUNDWATER WASTE DISPOSAL 9 <br />5.10LABORATORY ANALYSES 10 <br />6.0 REPORTING 10 <br />7.0 PROJECT SCHEDULE 11 <br />11 <br />CONDOR