My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
2245
>
2900 - Site Mitigation Program
>
PR0540822
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2021 3:30:30 PM
Creation date
5/13/2020 3:05:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0540822
PE
2960
FACILITY_ID
FA0023389
FACILITY_NAME
FORMER HELENA CHEMICAL FACILITY
STREET_NUMBER
2245
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16336017
CURRENT_STATUS
01
SITE_LOCATION
2245 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT <br />ITEMS TO BE INCLUDED IN A SITE ASSESSMENT REPORT <br />The outline below is a minimum requirement for items to be included and discussed in the text <br />of all site assessment reports submitted to the Board. Other supporting data to be included in <br />the report, either within the text of the report or in appendices, are italicized at the end of each <br />section. All reports must be signed by a registered geologist, certified engineering geologist, or <br />civil engineer registered or certified by the State of California. Other pertinent information <br />specific to each individual investigation also should be included. <br />INTRODUCTION <br />Summary of past investigations <br />Purpose of the recent investigation <br />Scope of the recent investigation <br />Time period in which the recent investigation was carried out <br />SUMMARY <br />Number of wells drilled <br />Results of soil and water analyses <br />Ground water flow direction and gradient <br />Possible source determination <br />FIELD INVESTIGATION <br />Well Construction <br />Number and depth of wells drilled <br />Date(s) wells drilled <br />Description of drilling and construction <br />Approximate locations relative to facility site(s) <br />Supporting Data: <br />A well construction diagram for each well should be included in the report which shows <br />the following details: <br />Total depth drilled <br />Depth of open hole (same as total depth drilled if no caving occurs) <br />Footage of hole collapsed <br />Length of slotted casing installed <br />Depth of bottom of casing <br />Depth to top of sand pack <br />Thickness of sand pack <br />Depth to top of bentonite seal <br />Thickness of bentonite seal <br />Thickness of concrete grout <br />Boring diameter <br />Casing diameter <br />Casing material <br />Size of perforations <br />Number of bags of sand <br />Well elevation at top of casing <br />Depth to ground water <br />Date of water level measurement <br />Page 1 of 3
The URL can be used to link to this page
Your browser does not support the video tag.