Monitoring Well Installation Work Plan — August 2017 <br /> NOMELLINI CONSTRUCTION CO. <br /> 1045 West Charter Way, Stockton, California <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 1.0. INTRODUCTION................................................................................................... 1 <br /> 2.0. SCOPE OF WORK................................................................................................ 1 <br /> 2.1. PERMITTING AND PRE-FIELD WORK ACTIVITIES ........................................ 2 <br /> 2.2. DRILLING AND SAMPLE ANALYSIS................................................................ 2 <br /> 2.3. MONITORING WELL INSTALLATION, DEVELOPMENT, AND SURVEY.........2 <br /> 2.4. GROUNDWATER SAMPLING AND ANALYSIS................................................ 3 <br /> 2.5. PREPARATION OF REPORT OF FINDINGS.................................................... 3 <br /> 3.0. FIELD PROCEDURES..........................................................................................3 <br /> 3.1. BORING ADVANCEMENT AND SOIL SAMPLING ...........................................4 <br /> 3.2. WELL COMPLETION AND ELEVATION SURVEY ...........................................4 <br /> 3.3. WELL DEVELOPMENT ..................................................................................... 5 <br /> 3.4. GROUNDWATER SAMPLING PROCEDURES................................................. 5 <br /> 3.5. EQUIPMENT DECONTAMINATION/WASTE MANAGEMENT.......................... 5 <br /> FIGURES <br /> Figure 1 - Location Map <br /> Figure 2 - Site Plan <br /> Figure 3 - Proposed Monitoring Well Design <br /> TABLES <br /> Table 1 — Summary of Monitoring Well Details <br /> Table 2- Analytical Results of Soil Samples <br /> Table 3 — Groundwater Analytical Data <br /> Table 4 - Grab Groundwater Analytical Results <br /> APPENDICES <br /> Appendix A — RWQCB Directive Letter <br /> Appendix B - Monitoring and Sampling Procedures <br />