My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1045
>
2900 - Site Mitigation Program
>
PR0541799
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 3:43:38 PM
Creation date
5/13/2020 3:06:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0541799
PE
2960
FACILITY_ID
FA0023968
FACILITY_NAME
NOMELLINI CONSTRUCTION CO
STREET_NUMBER
1045
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323040
CURRENT_STATUS
01
SITE_LOCATION
1045 W CHARTER WAY
P_LOCATION
01
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
29 August 2017 AdvancedGeo <br /> AGE Project No. 95-0121 Environmental <br /> Page 5 of 5 <br /> 3.3. WELL DEVELOPMENT <br /> Development of the proposed wells will consist of a combination of bailing with a stainless <br /> steel bailer to remove the major portion of fine-grained sediment from inside the well, <br /> surging to flush out or draw in sediment from the filter pack, and additional groundwater <br /> evacuation with a Waterra inertia pump to finish the removal of fine-grained sediment. <br /> Developmental purging activities will be continued until field parameters (pH, electrical <br /> conductivity, and temperature) have stabilized and purged water is visually sediment-free. <br /> 3.4. GROUNDWATER SAMPLING PROCEDURES <br /> Groundwater sample collection will be performed in accordance with AGE's standard <br /> monitoring and sampling procedures, which have been included as Appendix B. <br /> 3.5. EQUIPMENT DECONTAMINATION/WASTE MANAGEMENT <br /> All sampling tools will be thoroughly rinsed with clean water after being washed with a <br /> solution of Alconox. All down-hole drilling equipment will be pressure washed prior to <br /> starting each boring. Rinseate and soil cuttings generated during drilling and groundwater <br /> sampling activities will be containerized in properly labeled, Department of Transportation <br /> (DOT)-approved 55-gallon drums and stored on-site in an area lacking public access. <br /> Disposal alternatives will be evaluated based on the results of soil analysis. <br />
The URL can be used to link to this page
Your browser does not support the video tag.