Laserfiche WebLink
Project No.4-419-0381 <br /> August 29,2019 <br /> Page No.27 <br /> 8.0 SAFETY EQUIPMENT LIST <br /> The following documents and materials will be made available at the project site.The Project Manager/Site <br /> Safety Officer will ensure that all these documents and materials are at the site before the project <br /> commences. He/she will also ensure that the instrumentation is in working order before work begins. <br /> 8.1 Supporting Documentation <br /> • NIOSH/OSHA Pocket Guide to Chemical Hazards <br /> • Respiratory Protection Program <br /> 8.2 Instrumentation <br /> • PID and calibration gas <br /> • Manuals for all instruments <br /> 8.3 Personal Protection Equipment(to be supplied by the Subcontractor) <br /> • Respirators with organic vapor cartridges, acid mist cartridges, and high-efficiency particulate air <br /> (HEPA)pre filters <br /> • Chemically resistant gloves(butyl rubber,nitrile, or PVC) <br /> • Safety boots <br /> • Safety glasses <br /> • Disposable ear plugs <br /> • Hard hats <br /> • First aid kit <br /> 8.4 Equipment <br /> • Fire extinguisher(type ABC) one per work zone,to be supplied by Subcontractor <br /> 8.5 Supplies <br /> • Distilled water <br /> • Tape <br /> • Soap <br /> • Water <br /> • Towels <br /> • Buckets(5-gallon capacity; quantity: >3) <br /> • Brush <br /> • Portable eye wash station <br /> 0,1 SALEM <br /> engineering group. inc. <br />