My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BROOKSIDE
>
2899
>
2900 - Site Mitigation Program
>
PR0544994
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 3:30:50 PM
Creation date
5/13/2020 3:15:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0544994
PE
2950
FACILITY_ID
FA0025595
FACILITY_NAME
RECLAMATION DISTRICT 2074 LEVEE MONITORING
STREET_NUMBER
2899
STREET_NAME
BROOKSIDE
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
11821001
CURRENT_STATUS
01
SITE_LOCATION
2899 BROOKSIDE RD
P_LOCATION
01
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Installation Instructions for Snap Seal Inclinometer Casing <br /> 4 Pre-Installation <br /> Before beginning the installation, ensure that all equipment, accessories and spares are available: <br /> • Casing and caps <br /> • Spare bottom and top caps <br /> • Spare casing length(s) <br /> • Grout tremie line <br /> • Grout valved bottom cap (if employing this method); c/w spare female grout valve <br /> • Drill rods to weigh casing <br /> • Safety line(if required) <br /> • Clean water supply to ballast casing <br /> • Repair Coupling and Alignment Tool (if required) <br /> • Hand saw <br /> • Casing collar protection (as required) <br /> • Chain or casing clamps <br /> Inspect casing lengths to insure that damage during transit has not occurred. Ensure that the inside of <br /> the casing is clean. To ensure the joint and casing interior will remain clean, only remove the protective <br /> end caps prior to installing the casing. Store the casing horizontally, fully supported, and out of the <br /> sunlight. Number each length, and assemble numerically to avoid errors, and to confirm correct depth. <br /> Do not assemble the casing prior to insertion in the borehole. <br /> Drill the borehole as vertical as possible, preferably within 1 degree. Flush the borehole clean, and verify <br /> that the borehole is fully open to the bottom. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.