My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BROOKSIDE
>
2899
>
2900 - Site Mitigation Program
>
PR0544994
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 3:30:50 PM
Creation date
5/13/2020 3:15:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0544994
PE
2950
FACILITY_ID
FA0025595
FACILITY_NAME
RECLAMATION DISTRICT 2074 LEVEE MONITORING
STREET_NUMBER
2899
STREET_NAME
BROOKSIDE
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
11821001
CURRENT_STATUS
01
SITE_LOCATION
2899 BROOKSIDE RD
P_LOCATION
01
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Installation Instructions for Snap Seal Inclinometer Casing <br /> Zb- <br /> I ---- <br /> --------------------------- ----- --- <br /> FULLY EXTENDED <br /> Talesooping Telmooping <br /> Sedlon Section <br /> ia^ <br /> FULLY RETRACTED <br /> Figure 4—RST Snap Seal Telescoping Section <br /> 6 Installing Snap Seal Casing <br /> 6.1 Installation Notes <br /> Casing Storage <br /> Casing should be stored horizontally and supported evenly so that it does not warp or bend. Whenever <br /> possible, casing should be stored in the shade since prolonged exposure to the heat of direct sunlight <br /> can cause deformation. <br /> The Borehole <br /> Drill the borehole as vertical as possible, preferably within 1 degree. Flush the borehole clean, and verify <br /> that the borehole is fully open to the bottom. Check the depth of the borehole before you begin installing <br /> the casing. Also consider that grout valves or external weights may be required for deeper boreholes. <br /> Groove Alignment <br /> It is important to have one set of grooves oriented down slope, in the direction of expected movement. If <br /> the direction cannot be determined, orient North/South. Alignment must be maintained throughout <br /> the installation, to avoid introducing torsion to the casing,thereby causing spiraling of the <br /> grooves. Never push the casing from the top or twist the casing during installation. <br /> Groove Direction of Expected <br /> Alignment Movement <br /> <--------------------> i]❑ <br /> Figure 5—Groove Alignment <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.