My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
26 (STATE ROUTE 26)
>
8203
>
3500 - Local Oversight Program
>
PR0545707
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 8:49:54 AM
Creation date
5/13/2020 3:21:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545707
PE
3528
FACILITY_ID
FA0003591
FACILITY_NAME
JOHN M RISHWAIN
STREET_NUMBER
8203
Direction
E
STREET_NAME
STATE ROUTE 26
City
STOCKTON
Zip
95215-9536
APN
10114021
CURRENT_STATUS
02
SITE_LOCATION
8203 E HWY 26
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i I <br /> FNVIRONMEN <br /> TA.E HEALTH DEPAt <br /> JOA COUNTY Unit Supervisors <br /> au h SAN Carl Borgman,R.E.H.S. <br /> Third Floor <br /> Mike Huggins,R.E.H.S.,R.D. . <br /> z.; .r �—e; •ti Donna K.Reran,R.11.H•S• 3p4 East Weber Avenue, <br /> Director California 95202-2708 Douglas W.Wilson,R.E.H.S. <br /> StOCICtOn, Margaret Lagorio,R.E.H.S. <br /> Al Olsen,R.E.Hs. 468-3420 <br /> Tele hone: (209) Robert McClellon,R.E.H.S. <br /> Program Manager P <br /> oq CV 0. • Laurie A.Cotulla,R.E.H.S. Fax: (209) 464-0138 Mark Barceilos,R.E.H.S, <br /> Program Manager <br /> JUL 0 9 ZODZ <br /> NICHOLAS BOKIDES <br /> MEL BOKIDES PETROLEUM INC <br /> 521 W PINE STREET <br /> LODI CA 95240 <br /> RE: Mel Bokides Petroleum SITE CODE: 691 <br /> 8203 Hwy 26 <br /> Stockton, CA 95204 <br /> San Joaquin County Environmental Health Department (EHD) has.reviewed the <br /> "Interim Soil Remediation Work Plan" dated June 10, 2002, prepared by <br /> Advanced GeoEnvironmental, Inc. (AGE) for the above referenced site. <br /> The work plan proposes installation of six vapor extraction wells, installing a soil <br /> vapor extraction system, operating the system for six months and conducting <br /> progress/confirmation sampling. This work plan is not approved. In the <br /> "Preliminary Investigation and Evaluation Report" dated March 7; 2002, AGE <br /> recommended preparation of a work plan for a vapor extraction feasibility study. <br /> ' In a letter dated May 7, 2002, EHD agreed with this recommendation and <br /> l requested a work plan for a vapor extraction feasibility study. <br /> Please submit a work plan that proposes installation of sufficient vapor extraction <br /> or extraction test. <br /> wells to conduct a feasibility study and conduction of a vapor <br /> In addition, a survey to identify all wells within'2000 radial feet of the site must be <br /> { conducted. Contact the Department of Water Resources and perform a physical <br /> search of the area to locate the wells. Submit the results of the survey to EHD <br /> that includes a map showing the location of the identified wells, the addresses <br /> where the wells are located and any known construction details of the wells. <br /> The extent of soil contamination to the north and east of the former underground <br /> storage tank location has not been defined. Soil samples from 30 feet to 80 feet <br /> below surface grade (bsg) were not analyzed from monitoring wells MW 2 and <br /> MW3 so the lateral shallow soil contamination at 30 to 40 feet bsg in borings B4 <br /> and B5 has not been defined to the west and south. The extent of soil <br /> contamination laterally and vertically must be defined. In the work plan for the <br /> vapor extraction feasibility study please include a proposal to define the extent of <br /> soil contamination at this site. This information will be necessay to design a <br /> complete vapor extraction system if the alternative proves to be feasible. The <br /> information is also necessary to calculate the:mass of.contamination at the site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.