My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
2122
>
2900 - Site Mitigation Program
>
PR0544211
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 4:24:38 PM
Creation date
5/13/2020 3:59:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544211
PE
2960
FACILITY_ID
FA0025128
FACILITY_NAME
RALPH'S SQUARE - BUI
STREET_NUMBER
2122
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16916201
CURRENT_STATUS
01
SITE_LOCATION
2122 S AIRPORT WAY
P_LOCATION
01
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
���s a�~ � <br /> ~ ,=� <br /> ^^^~~^~^ m~�" "= <br /> o " � <br /> y,� '~ <br /> YYalcI Boards <br /> -------------- <br /> Central Valley <br /> ��� <br /> Centna| Va|1ey Regional Water Quality Control Board <br /> 17December 2018 <br /> Ralph Lee White Peter Bui & Kimberly Hoang <br /> 2201E. 8mStreet 40U4K4oddiaCircle <br /> Stockton, CAR52O8 Stockton, CA952O8 <br /> RALPH'S SC3UARE, 2122 S. AIRPORT WAY, STOCKT0N' SAN JQAQU{N COUNTY, CASE# <br /> 390995 <br /> � <br /> Central Valley Regional Water Quality Control Board (Central Valley Water Board)staff reviewed the � <br /> Off-Site Assessment Work Plan (Work Plan)dated 30 November 2018, submitted by Advanced ' <br /> GeoEnvironmental Inc. (AGE)for the Ralph's Square unauthorized petroleum release at 2122 <br /> S.Airport Way inStockton(Site)` (n-the Work Plan, AGE proposes toinstall two monitoring wells <br /> off-Site to the east to delineate the lateral extent of hydrocarbon impact to groundwater <br /> downgnodientofthe Site. The two monitoring wells are proposed asfollows: <br /> Soil Sa pling Well Sampling <br /> Total Depth Screen Interval <br /> Depth Analysis Frequency <br /> 50 25-50 5ft intervals from 5ft Lithologic Quarterly for <br /> to Total Depth logging only 4 quarters <br /> ft bgs=feet below ground surface <br /> Central Valley Water Board staff concurs with the proposed scope of work, with the following <br /> comments: <br /> 1. Central Valley Water Board staff typically request that monitoring wells which intersect the <br /> water table baconstructed with a 154bntscreen interval with approximately 5feet above and <br /> 1Ofeet below the water table. However, depth towater atthe Site has increased <br /> approximately 17 feet in the past 16 years, and has fluctuated greatly in the past 4 years <br /> (from 25.70to33.B7feet below top ofcasing). Ansuch, while the proposed screen length of <br /> 25 feet is excessive, a longer than usual screen interval is reasonable at this Site. <br /> Please install these wells with 20 feet of screen, with approximately 5 feet above and 15 feet <br /> below the water table. The actual installed screen depth should bobased ondepth towater <br /> and subsurface conditions observed during installation. <br /> 2. As not specified in the Work Plan, please wait a minimum of 48 hours after installation to <br /> develop the monitoring wells. <br /> KARL c Lv"GLeuma. ps'"H * / p^=1C°pv"r+ ESU_ EAEG""VE OP,IcEr <br /> .mmStir,m".etDrive:2m`m""""o°"m."n^o,om . "==.°^""m"`".,""/cen'"*"/lay <br />
The URL can be used to link to this page
Your browser does not support the video tag.