My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ALPINE
>
1624
>
2900 - Site Mitigation Program
>
PR0544402
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 4:57:36 PM
Creation date
5/13/2020 4:00:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0544402
PE
2959
FACILITY_ID
FA0025244
FACILITY_NAME
FORMER KEARNEY - KPF FACILITY
STREET_NUMBER
1624
Direction
E
STREET_NAME
ALPINE
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
11708006
CURRENT_STATUS
01
SITE_LOCATION
1624 E ALPINE AVE
P_LOCATION
01
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Delineation and Destruction Work Plan for Well B-1 <br /> Table 1 <br /> Carbon Ranges for Reporting Total Petroleum Hydrocarbon Sample Results <br /> TPH Fraction Carbon Range <br /> Low aliphatic C5—C8 <br /> Medium aliphatic C9—C18 <br /> High aliphatic C19—C32 <br /> Low aromatic C6—C8 <br /> Medium aromatic C9—C16 <br /> High aromatic C17—C32 <br /> Source:DTSC 2015. <br /> Note:TPH=total petroleum hydrocarbon. <br /> Sample coolers containing groundwater and soil samples will be shipped or delivered to the <br /> laboratory for analysis. <br /> 2.4.6 Borehole Abandonment <br /> Upon completion of sampling, all downhole equipment will be removed and the borehole will be <br /> properly abandoned per the County Well Standards, Section 13.17 (EHD 2005). The boreholes <br /> will be backfilled using hydrated bentonite chips/pellets. <br /> 3 WELL DESTRUCTION ACTIVITIES <br /> All field activities will be performed in conformance with the site-specific health and safety plan <br /> (Appendix B, Health and Safety Plan). <br /> 3.1 Pre-Destruction Activities <br /> A well destruction permit application will be submitted to the County EHD upon approval of this <br /> delineation and destruction work plan. Prior to the commencement of field activities, a private <br /> underground-utilities-locating company will perform a survey to determine whether underground <br /> utilities are present near the sample locations. In addition, Dudek will contact USA North 811 at <br /> least 2 days prior to subsurface work. <br /> Dudek will contact the site owner to arrange for site access, which may require Premium Truck <br /> Repair to move two or more trucks/trailers to accommodate the drill rig. Dudek will give the site <br /> owner as much notice as possible to make the necessary arrangements. <br /> The well will be destroyed by a California-licensed C-57 contractor. <br /> 10886-7 <br /> DUDEK 8 January 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.