Laserfiche WebLink
Health and Safety Plan for <br /> Delineation and Destruction of Well B-1 <br /> 6 WORK AREAS <br /> Work areas may be established during the field activities to limit access to authorized personnel. <br /> Those zones include an exclusion, contamination reduction and support areas. <br /> 6.1 Exclusion Area <br /> Access to the work area during field activities will be controlled and unauthorized personnel and <br /> visitors shall not be allowed access to the facility project Exclusion Area. Only personnel with <br /> specific operational duties should be present in the Exclusion Area, when field operations are <br /> being conducted. Site control at work locations shall be established using barricades, cones, and <br /> flagging tape, as needed to prevent unauthorized access to the Exclusion Area during work. <br /> The Exclusion Area will be established to control access to the work areas and will extend from <br /> a distance of at least 10 feet from the area where potentially impacted media is being sampled or <br /> tested, and at least 25 feet in areas where drill rigs or heavy equipment is in use. The size and <br /> shape of the Exclusion Area will be determined based on surrounding operations and <br /> surrounding public areas. At minimum, Level D protection will be required for all personnel <br /> within the Exclusion Area. <br /> 6.2 Contamination Reduction Area <br /> A Contamination Reduction Area may be designated in an area adjacent to and upwind from the <br /> Exclusion Area. In this area, personnel and equipment will be decontaminated, as appropriate, <br /> after work has been completed. <br /> 6.3 Support Area <br /> The Support Area covers all areas outside the Exclusion and Contaminated Reduction Areas. The <br /> Support Area provides for all administrative and support functions necessary to keep all field <br /> activities running smoothly. Water, hand washing area, and restroom facilities for field personnel <br /> shall be provided at this location. The entire project area will be considered the Support Area <br /> when no field activities are being conducted. <br /> 10275-4 <br /> D U D E K 21 June 2017 <br />