My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008817
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
26 (STATE ROUTE 26)
>
8203
>
3500 - Local Oversight Program
>
PR0545707
>
ARCHIVED REPORTS_XR0008817
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 8:48:27 AM
Creation date
5/13/2020 4:01:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008817
RECORD_ID
PR0545707
PE
3528
FACILITY_ID
FA0003591
FACILITY_NAME
JOHN M RISHWAIN
STREET_NUMBER
8203
Direction
E
STREET_NAME
STATE ROUTE 26
City
STOCKTON
Zip
95215-9536
APN
10114021
CURRENT_STATUS
02
SITE_LOCATION
8203 E HWY 26
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
28 May 2004 <br /> AGE-NC Project No 99-0645 <br /> Page 3 of 4 <br /> 3 2 ANALYTICAL RESULTS OF WATER SAMPLES <br /> No target analytes were detected this quarter Analytical results from the ground water samples are <br /> summarized in Tables 2 and 3 The laboratory report(CTEL Project No CT214-0403101), quality <br /> assurance/quality control (QA/QC) and chain-of-custody are included in Appendix C <br /> 4,0. SUMMARY AND CONCLUSIONS <br /> Based on the data collected from the site, AGE concludes <br /> • Ground water flow direction is estimated to be towards the southwest during the March <br /> sampling and monitoring event <br /> • No target analytes were detected this quarter <br /> . 5.0. RECOMMENDATIONS <br /> Based upon data collected from the site, AGE recommends <br /> Continued quarterly ground water monitoring, the next quarterly monitoring event should be <br /> scheduled for June 2004 <br /> Implementation of the Interim Soil Remediation Work Plan, dated 10 June 2002 The design of the <br /> soil vapor extraction well network should include all vapor wells on site, including the monitoring <br /> well screen from well MW-1, due to the detections of dissolved MTBE <br /> If the detections of dissolved MTBE continue,installation of an additional ground water monitoring <br /> well northeast of the site <br /> Advanced GeoEnvironmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.