Laserfiche WebLink
T <br /> 1 <br /> 1 <br /> SVE INLET 1 <br /> CARBON VESSELS <br /> 1 <br /> & BLOWER ASSEMBLAGE 1 1 <br /> 1 1 1 -� �2 <br />' MW-iR <br /> • <br /> MW-1 <br /> F- EXCAVATION AREA <br /> l <br /> V <br /> W fB MAY 1999 l <br /> B5 #,y �CH 200 AREA <br /> G <br /> MW-3 FORMER USTs <br /> �2 fA <br /> V+WS r <br /> NEW UST <br />' 134 <br /> r <br /> C41#7�, <br /> r r MW-2 <br /> *0 137 <br /> FORMER DISPENSER <br /> DW-1 <br />' LEGENp <br /> ® BUILDING <br />' FORMER DOMESTIC/MONITORING WATER WELL <br /> MONITORING WEILL <br /> SOIL BORING LOCATION <br />' • SOIL SAMPLE LOCATION T T <br /> + SHALLOW SOIL VAPOR EXTRACTION WELL (15--40 FEET) lv <br /> -�- DEEP SOIL VAPOR EXTRACTION WELL (45-70 FEET) SC's <br /> 0 16 30 <br />' \ EXTENT OF ANGLED SOIL BORING <br /> \ FEET <br /> SITE PLAN Advanced <br /> GeoEnvironmental, Inc. <br /> Former MEL BOKIDES PETROLEUM — Linden of waamw `MMMT' <br /> 8203 EAST HIGHWAY 26 PROJECT NO AGE--NC-99-0645 F= MBPIFIg2 FIGURE <br /> STOCKTON CALIFORNIA DATE 19 DECE BER 2005 DRAWN BY MAC 2 <br />