Laserfiche WebLink
Spill Prevention compliance corporation <br /> Periodic Integrity Test Certificate <br /> P.O. Box 1289........Waterford, CA 95386 Telephone: (209) 969-0851 <br /> Email: soccorpAbotmail.com <br /> ------------------------------------------------------------------------------------------------------------------------------------------------------ <br /> Client: Belkor AR-John Deere Contact : _Ricky Caraballo,Risk Process Supervisor <br /> Address: 1120 W. Charter Way _Phone No.: 209-252-2490 <br /> City/State/Zip; Stockton CA 95206 Date of Test: 2-6-2020 <br /> Product Stored: Waste Oil-a UL#: D77669749 <br /> Tank Information(Brand/gallonage/Fuel Stored/UL or other serial##/miscellaneous) <br /> Superior Storage Tanks/500 aals/Waste Oil/UL142[UL#D77669749/Double Wall Steel/5yrs old(estimated) <br /> Description of Secondary Containment Integral Secondary Containment <br /> Date of Test-2-6-2020 Test Supervisor(s) Todd McWhorter <br /> METHOD OF PERIODIC INTEGRITY TEST-Primary XX Secondary XX <br /> 1. Steel Thickness Test (in accordance with API-653 and/or UL 142 Std. (10"' edition)-Readings Steel <br /> Thickness UL142 min. .093in./Avg Steel thickness =.120 in. as measured <br /> 2. Inert Gas Blanket <br /> Gas Used: Nitrogen CO2: ; Other(specify) <br /> Air Pressure-Test Vacuum Test ; <br /> Initial Reading (document psi/WC readings) Time <br /> End Readings (document psi/WC readings) Time <br /> Duration of Test: % drop <br /> 3. Sonar-TestYN (document db readings) Duration <br /> 4. Camera(visual) model Lorcx MC81845/interstitial (Result: P/F)_Pass <br /> 5. Hydro-Carbon Sensor(probe)model OMNTEC BOA- _(ResultP/F) Pass <br /> 6. Hydrology (Water Column) ( inches of water column readings) <br /> Duration % Drop Results (P/F) <br /> 7. Other: Inspect Vessel& secondary containment. AST clearance is 2 inches above floor. CRDM <br /> resent no evidence of leaking product from orimary vessels stem accessible for inspection: No <br /> product in secondary. Tank has continuous electronic monitors-alarms & pneumatic auto shut <br /> downs at high product levels. Upon inspection,no evidence of weld breaks,punctures,cracks,or_other <br /> structural damage to the tank. : PASS <br /> TEST RESULTS <br /> I"-Stage: <br /> Pass XX Fail_(quantify) SENSOR DETECTS NO PRODUCT , NOR LEAKS FROM PRIMARY <br /> TANK INTO SECONDARY CONTAINMENT <br /> 2"d-Stage: <br /> Pass XX Fail_(quantify) NO VISUAL EVIDENCE OF PRODUCT IN THE SECONDARY <br /> NOR OF ANY OTHER LEAKS–STEEL THICKNESS AVERAGE MEASURED TO BE IN <br /> EXCESS OF STEEL THICKNESS MINIMUMS UNDER UL 142 STANDARD. <br /> Comments section Tank is anchored to concrete pad _ data on file <br /> Next Scheduled Periodic Integrity Test 2-6-2025 <br /> A, Pacific Environmental Systems,Representative <br /> STI SP001 Certifier) Inspector No.: AST 13501.3 <br />