Laserfiche WebLink
WELL MONITORING DATA SHEET <br /> BTS #: 080520-MP1 Client: GeoSyntec <br /> Sampler: Matt Date: 5/ /2008 <br /> Well I.D.: ( Well Diameter: 3 L'_�_4 6 8 <br /> Total Well Depth (TD): Depth to Water (DTW): 575.57p <br /> Depth to Free Product: Thickness of Free Product (feet): <br /> Referenced to: Pv Grade ID.O. Meter (if req'd): �Ys HACH <br /> DTW with 80% Recharge [(Height of Water Column x 0.20) + DTW]: .57-9-5' <br /> Purge Method: Bailer q� Waterra Sampling Method: Bailer <br /> Disposable Bailer y><� Peristaltic ,sable Bailer <br /> Postive Air Did lacement Extraction Pump Extraction Port <br /> ectnc Submersible Other Dedicated Tubing <br /> Other: <br /> Well Diameter Multiplier Well Diameter Multiplier <br /> / _ �'jy [� V 0.04 4" 0.65 <br /> ( (e (Gals.)X / = y D• Gals. 2" 0.16 G 1.47 <br /> 1 Case Volume Specified Volumes Calculated Volume 3" 0.37 Other radius''0.163 <br /> Cond. Turbidity <br /> Time Temp (pF) pH (MS o (NTUs) Gals. Removed Observations <br /> 93r" 9. 7-� S /S ( /,;- 0 <br /> Fs-( /9. ( 7.0 35'6.2 z( �2. o <br /> o7 J. `?.0 3218 -7 z/X. 0 <br /> Did well dewater? Yes N Gallons actually evacuated: 2-19 - <br /> Sampling Date: 5.;2o .09 Sampling Time: �/O Depth to Water: (j <br /> Sample I.D.: /0/mr" ( Laboratory: CalScience <br /> Analyzed for: TPH-G BTEx MTBE TPH-D Oars Other: See SOW <br /> EB I.D. (if applicable): @ T6ae Duplicate I.D. (if applicable): C) <br /> Analyzed for: TPH-G BTEX MTBE TPH-D other: <br /> D.O. (if req'd): Pre-purge: 0. 657 mE/1- Post-purge: la l`1 mg/L <br /> O.R.P. (if req'd): Pre-purge: / ry, V mV Post-purge: w �, 7 mV <br /> it Blaine Tech Services, Inc. 1680 Rogers Ave., San Jose, CA 35112 (800) 545-7558 <br /> 61�Q�lr <br />