Laserfiche WebLink
WELL MONITORING DATA SHEET <br /> BTS #: 080730-MPI Client: GeoSyntec <br /> Sampler: Matt Joe Date: 7/30/2008 <br /> Well I.D.: Well Diameter: 0 3 4- 6 8 <br /> Total Well Depth (TD): <0 7? .DC7 Depth to Water (DTW): <br /> Depth to Free Product: Thickness of Free Product (feet): <br /> Referenced to: Pv Grade D.O. Meter (if req'd): /(Y Sp xAcx <br /> . ...... <br /> DTW with 80% Recharge [(Height of Water Column x 0.20 + <br /> Purge Method: Bailer ��� Waterra Sampling Method: Bailer <br /> Disposable Bailer Peristaltict iisposabl er <br /> Postive Air Displacement Extraction Pump Extraction Port <br /> Ei ctri� -ble Other Dedicated Tubing <br /> Other: <br /> Well Diameter Multiplier Well Diameter Multiplier <br /> IBJ <br /> V. 0.04 4" 0.65 <br /> �( • (Gals.)X _ [�1' 7 Gals. '.. 0.16 6" 1.47 <br /> 1 Case Volume Specified Volumes Calculated Volume 3 0.37 other radius'*0.163 <br /> Cond. Turbidity <br /> Time Temp (uF) pH (mS or4M (NTU-s-) Gals. Removed Observations <br /> L G✓ <br /> 70.6 _ 2F0 � q ( ¢ <br /> Did well dewater? Yes Gallons actually evacuated: f57,0 <br /> Sampling Date: 2_-� Sampling Time: 2_ c2 Depth to Water: Cc 62. r <br /> Sample I.D.: AV_ Laboratory: CalScience <br /> Analyzed for: TPH-G BTEX MTBE TPI -D aXYrs Other: See SOW <br /> EB I.D. (if applicable): `r Tim Duplicate I.D. (if applicable): <br /> Analyzed for: TPH-G BTEX MTBE TPH-D Other: <br /> D.O. (if req"d): Pre-purge: mg/L Post-purge: CZ 9 ms/L <br /> Q.R.P. (if req'd): Pre-purge: �0 mV Post-purge: 2 mV <br /> Tine Tech Services, Inc. 1650 Rogers Ave., San Jose, CA 95112 (500) 545-7555 <br /> c'. Cl��-fes <br /> � . _ _ <br />