Laserfiche WebLink
WELL MONITORING DATA SHEET <br /> BTS #: 080730-MP1 Client: GeoSyntec <br /> Sampler: Matt Joe Date: 7/30/2008 <br /> Well I.D.: ,. Well Diameter: 3 4 6 8 <br /> Total Well Depth (TD): 9 Depth to Water (DTW): 5-9.Cea <br /> Depth to Free Product: Thiclaless of Free Product (feet): <br /> Referenced to: 40 Grade D.Q. Meter (if req'd): L2a HACH <br /> DTW with 8Wlo Recharge [(Height of Water Column x 0.20) + DTW]. Sr <br /> Purge Method: Bailer 0" Waterra Sampling Method: Bailer <br /> Disposable Bailer Peristaltic i asable ler <br /> Postive cement Extraction Pump xtraction Port <br /> ectrie Sub tble Other Dedicated Tubing <br /> Other: <br /> Well Diameter Multiplier Well Diameter Multiplier <br /> ]" 0.04 4" 0.65 <br /> _ ��. 2" 0.16 6" 1.47 <br /> (Gals.)X Gals. <br /> 1 Case Volume Specified Volumes _ Calculated Volume 3" 0.37 other radius2'0.163 <br /> Cond. Turbidity <br /> Time Temp (°F) pH (mS ort' (NTUs) Gals. Removed Observations <br /> 1 330 4-9-9 '70"•�2 ( 5- <br /> p <br /> l 3 � 67. .meq{d i • , 6 t1 <br /> 3� 6-e4_ `fLL,. .5 46 <br /> Did well dewater? Yes o Gallons actually evacuated: d <br /> Sampling Date: ` '�� �I Sampling Time: N1,67 Depth to Water: j j <br /> Sample I.D.: M,41 .-. \-52? Laboratory: CalScience <br /> Analyzed for: TPH-G eTex MTBE TPH-D oxA-5 Other: See SOW <br /> EB I.D. (if applicable): @ Time Duplicate I.D. (if applicable): <br /> Analyzed for: TPH-G BTEX MTBE TPH-D Other: <br /> D.Q. (if req'd): Pre-purge: , Mg/L Post-purge: mg/L <br /> O.R.P. (if req'd): Pre-purge: ( 1nV Post-purge: 111V <br /> Blaine Tech Services, Inc. 1680 Rogers Ave., San Jose, CA 95112 (800) 545-7550 <br />