Laserfiche WebLink
WELL MONITORING DATA SHEET <br /> BTS #: 080730-MP1 Client: GeoSyntec <br /> Sampler: Matt Joe Date: 7/30/2008 <br /> Well I.D.: Cv - /go a Well Diameter:C;) 3 4 6 8 <br /> Total Well Depth (TD): �r Depth to Water (DTW): � , 5--5- <br /> Depth to Free Product: Thickness of Free Product (feet): <br /> Referenced to: Grade D.O. Meter (if req'd): (_1V HACH <br /> DIM with 80% Recharge [(Height of Water Column x 0.20) + DTW]:' Eli- <br /> Purge <br /> Method: Bailer & /(5 Waterra Sampling Method: B <br /> Disposable Bailer S Peristalticspasa <br /> Postive Air Displacement Extraction Pump Extraction Port <br /> �lect- u mersl Other Dedicated Tubing <br /> Other: <br /> Well Diameter Multiplier Well Diameter Multiplier <br /> 1" 0.04 4" 0.65 <br /> � <br /> (Gals.}X <br /> ® �- Gals. 2" 0.16 6" 1.47' _ <br /> 1 Case Volume Specified Volumes Calculated Volume 3. 0.37 other radius' 0.163 <br /> Cond. Turbidity <br /> Time Temp (T) pH (mS or ) (NTUs) Gals. Removed Observations <br /> C X71 c' 1 11 9. 0 <br /> /to 67 .3 ?., ( . �7 / , O <br /> CP7a q -7 . 1 7a (2 <br /> Did well dewater? Yes No Gallons actually evacuated: <br /> Sampling Date: -7 1.3o p Sampling Time: Depth to Water: 5.- (saw <br /> Sample I.D.: ty.. Laboratory: CalScience <br /> Analyzed for: TPH-G BTEX MTBE TPH-D oxv'S Other: See SOW <br /> EB I.D. (if applicable): Ti= Duplicate I.D. (if applicable): <br /> Analyzed for: TPH-c BTEX MTBE TPx-D Other: <br /> D.O. (if req'd): Pre-purge: -5 . 0 <br /> m6/E Post-purge: 57,41 mg/L <br /> O.R.P. (if req'd): Pre-purge: � mV Post-purge: 6q mV <br /> Blaine Tech Services, Inc. 1680 Rogers Ave., San Jose, CA 95112 (800) 545-7555 <br />