Laserfiche WebLink
' Ms. Amy Terrell <br /> 31 October 2008 <br /> Page 9 <br /> ' Attachments: Table 1 Monitoring Well Construction Summary <br /> Table 2 Groundwater Level Summaries <br /> Table 3 Groundwater Monitoring Program <br /> Table 4 Remediation Pilot Study Monitoring Program <br /> Table 5 Analytical Data Summary <br /> Table 6 Geochemical Parameters Data Summary <br /> Figure 1 Site Location Map <br /> Figure 2 Site Map <br /> Figure 3a Groundwater Elevation Contour Map - August 2008 <br /> Figure 3b Groundwater Elevation Contour Map -January 2008 <br /> Figure 4 Groundwater Elevations over time <br /> Figure 5 Site Groundwater Monitoring program Analytical Results <br /> Figure 6 MW-2 Data Summary <br /> Figure 7 MW-3 Data Summary <br /> Figure 8 MW-6R Data Summary <br /> Figure 9 MW-7 Data Summary <br /> Figure 10 MW-5 Data Summary <br /> Figure 11 Expanded Pilot Test Analytical Results <br /> ' Attachment 1 —Blaine Tech Field Report <br /> ' Attachment 2—Calscience Analytical Laboratory Report <br /> Attachment 3 —CD containing Historical Data <br /> Copies to: Ms. Nancy Bishop <br /> Mr. Kirk Williams, WFS <br /> Mr. Fred Strauss, WFS <br /> Mr. Harlin Knoll, San Joaquin County Environmental Health <br /> P:\PRJ2003REM\WFS\VER\VERG\3Q08\Report Text\3Q08 Report WFS-VER.doc <br /> iengineers I scientists I innovators <br />