Laserfiche WebLink
GEOSyNwc CoNsuLTANTs <br /> Ms Amy Terrell <br /> 1 February 2005 <br /> Page 4 <br /> FUTURE WORK <br /> Combined groundwater monitoring and Remediation Pilot Study Monitoring will <br />' be performed in February 2005 and reported by 1 April 2004 If you have any <br /> questions or comments, please call Nancy Bishop, Manager Environment, Health & <br /> Safety for VWFS at (925) 283-0353 or either of the undersigned at (510) 836-3034 <br /> 1 ' <br /> Sincerely, <br /> �4NR 0 Susan H Skoe, P E <br /> En gi er <br /> No 30 <br /> CF-FmFtSD <br /> WDFDOGEOLMST <br /> Carolyn Kneiblher, C HG <br /> �TFOF GAS-�FAssociate Hydrogeologist <br /> Copy w/attachments to <br /> Ms Nancy Bishop, WFS <br /> 1 Mr Harlin Knoll, San Joaquin County Environmental Health <br /> Attachments <br /> Table 1 Groundwater Level Summaries <br /> Table 2 Geochemical Parameters Data Summary <br /> Figure 1 Site Location Map <br />' Figure 2 Site Map <br /> Attachment 1 Blame Tech Field Report <br /> Attachment 2 Keystone Laboratory Analytical Data Report <br /> I <br /> P 1PRJ2003REM\WFSIVER\MONR4Q04\OAK04078 doc <br /> WGYamu rEwCLAME �� <br />