KLEINFELDER <br /> • The wells are generally screened from 5 feet above to 20 feet below first ground <br /> water. The screen length is reduced if an aquitard with a minimum thickness of 5 <br /> feet is encountered. If an aquitard is encountered the well is usually terminated 1 <br /> to 2 Icet into the aquitard. Effort is made not to screen across two aquifers. If <br /> confined aquifer conditions or high vadose zone contamination is encountered, the <br /> well screen is usually not set above the depth of first encountered ground water. <br /> Wells are usually not set in areas of suspected significant soil contamination. <br /> • The PVC pipe and end caps are steam cleaned prior to installation. <br /> • The annular space between the screen and the wall of the boring is backfilled with <br /> the appropriate clean Lone Star Industries 0/30 or 2/12 Monterey sand to <br /> approximately 2 feet above the top of the perforated sections. Based on soil logs <br /> or it sieve test, modifications may be made regarding the size of sand to be used. <br /> Installation of the 0/30 sand may require that the sand be tremmied, using clean <br /> water. In this event, a sample of the tremie water is collected, unless the source is <br /> known to be clean. <br /> • A 3- to 5-foot bentonite plug is placed above the sand pack to provide a seal <br /> against surface water infiltration. <br /> • The remaining annular space is filled to the surface with tremmied <br /> cement/bentonite grout to the surface. <br /> The wells are secured in a locking stovepipe. The well heads may be enclosed in <br /> a cement utility box set flush to the ground surface located in a traffic area. <br /> B-3.2 Monitoring Well Develo rpment and Samnline <br /> 'File wells are developed to reduce the effects of drilling on the formation and to increase the <br /> effective hydraulic radius of the well. <br /> Monitoring wells are generally developed 24 to 48 hours after installation to allow the grout to <br /> set. Each well is first sampled with a clear acrylic bailer to visually inspect for hydrocarbon <br /> layer or sheen. If no product layer or sheen is observed on the water, the well is developed by <br /> surging, pumping, or bailing. Surging along the screened interval of the well is performed to <br /> draw the sediment from the formation into the filter pack and the well and to set the sand pack. <br /> The sediment laden water is purged from the well at a rate of between 0.75 to 10 gallons per <br /> minute (gpm) depending on recharge rate and casing size. Development continues until the <br /> discharge runs relatively clear of fines. Approximately 5 to 10 well volumes are generally <br /> removed from each monitoring well. Discharge water is stored in 55-gallon drums and left on <br /> site for later discharge or disposal by the client, depending on laboratory results. <br /> 20-3978-01.W 3 i/2017R491 Page No.B-4 <br /> Copyright 1997. Kleinfelder. Inc. October 4, 1997 <br />