Laserfiche WebLink
File No. 20-3978-O1.P02 <br /> KLEINFELDER <br /> November 14, 1996 <br /> B-3.2 Monitoring Well Development <br /> The wells are developed to reduce the effects of drilling on the formation and to increase <br /> the effective hydraulic radius of the wells. <br /> Monitoring wells are generally developed 24 to 48 hours after installation to allow the <br /> grout to set. Each well is first sampled with a clear disposable bailer to visually inspect <br /> for a hydrocarbon layer or sheen. If no product layer or sheen is observed on the water, <br /> the well is developed by surging, pumping or bailing. Surging along the screened <br /> interval of the well is performed to draw the sediment from the formation into the filter <br /> pack and the well, and to set the sand pack. Development continues until the discharge <br /> runs relatively clear of fines. Approximately 5 to 10 well volumes are generally removed <br /> from each monitoring well. Discharge water is stored in 55-gallon drums and left on site <br /> for later discharge or disposal by the client, depending on laboratory results. The drums <br /> are labeled with the date, well number, and a contact person and phone number. <br /> B-3.3 Equipment Decontamination <br /> To reduce the potential for cross-contamination between wells, developing equipment is <br /> washed in a trisodium phosphate or non-phosphate detergent solution and rinsed in <br /> distilled water or steam cleaned prior to use in the next monitoring well. <br /> B-3.4 Well Survey <br /> The locations of soil borings and monitoring wells, and the elevation of the top of the <br /> PVC casings are usually surveyed and tied into permanent markers, if readily available. <br /> Survey accuracy is 0.1 foot for the "x" and "y" coordinates and .01 foot for the 'Y' <br /> coordinate. The depth to static groundwater is measured from a set location at the top of <br /> the PVC casing (usually the north rim). The depth of water is then subtracted from the <br /> elevation of the top of the well casing to provide a groundwater elevation for each <br /> monitoring well location. <br /> B-4 GROUNDWATER MONITORING <br /> B-4.1 Water Level Measurements <br /> Water level measurements are made in the wells prior to purging and sampling the wells. <br /> Measurement protocol is as follows: <br /> 1. The water level probe is decontaminated in a trisodium phosphate or non- <br /> phosphate detergent wash, followed by a distilled water rinse, prior to use in each <br /> well. <br /> 20-3978-OI.PO2/MP960139 Page 8-5 ©1996, Kleinfelder, Inc. <br />