Laserfiche WebLink
I Feasibility Study, Feasibility Study Report, draft Remedial <br /> 2 Action Plan, and Community Relations Plan and shall contain a <br /> 3 schedule for implementation of each element. <br /> 4 a. The Remedial Investigation portion of the Workplan <br /> 5 shall address, at a minimum, the following elements: <br /> 6 (1) Site background <br /> 7 (a) A description of the Site and the <br /> 8 operations conducted at the Site <br /> 9 (historical and present including, but not <br /> 10 limited to: <br /> 11 (i) Past and present hazardous materials <br /> 12 handling, storage, or disposal <br /> 13 systems both on-site and off-site; <br /> 14 (ii) Past and present hazardous waste <br /> 15 handling, storage, or disposal <br /> 16 systems both on-site and off-site; <br /> 17 (iii) Past chemical spills, leaks, or <br /> 18 fires; <br /> 19 (iv) Past and present washdown and cleanup <br /> 20 areas; <br /> 21 (v) Past and present impoundments, sumps, <br /> 22 tanks, pipelines, and landfills; <br /> 23 (vi) Past and present product storage <br /> 24 areas; <br /> 25 <br /> 26 <br /> 27 <br /> COURT PAPER <br /> {TAT1 01 RERO 8-7 <br /> STC. 113 (REV.B-]21 -11_ <br /> 85 NJW <br />