My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STOCKTON
>
942
>
2900 - Site Mitigation Program
>
PR0516727
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 2:18:16 PM
Creation date
5/14/2020 1:37:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0516727
PE
2965
FACILITY_ID
FA0012758
FACILITY_NAME
DIAMOND FOOD PROCESSORS OF RIPON
STREET_NUMBER
942
Direction
S
STREET_NAME
STOCKTON
STREET_TYPE
AVE
City
RIPON
Zip
95366
APN
25934012
CURRENT_STATUS
01
SITE_LOCATION
942 S STOCKTON AVE
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
',I ATE OF CALIFORNIA - Environmental ProteL''-n Agency PETE WILSON, Governor <br /> CALIFORNIA REGIONAL WATER OLMIFTY CONTROL BOARD low <br /> CENTRAL VALLEY REGION _ gg <br /> 3443 Routier Road, Suite A <br /> Sacramento, CA 95827-3098 <br /> PHONE: (916) 255-3000 <br /> FAX: (916) 255-3015 <br /> 2 September 1993 <br /> Mr. Dennis Abrahamson ' <br /> Simpson Paper Company <br /> Ripon Mill <br /> 942 South Stockton Avenue = <br /> Ripon, CA 95366 <br /> APPROVAL OF INSTALLATION OF WATER SUPPLY WELL NO. 8, SIMPSON PAPER (�OMPA$ <br /> RIPON, SAN JOA QUIN COUNTY (CASE# 449) <br /> We have reviewed the proposal to install a new water supply well at Simpson Paper Company, <br /> Ripon Mill. The proposed well will be a 12 3/4 inch diameter, 1/4 inch steel casing, 210 foot deep <br /> well. We approve the proposal and Simpson Paper Company may proceed with the installation of <br /> the new water supply well. <br /> We request that you provide our office the following information: <br /> 1. The design and proposed operational pumping rate. <br /> 2. The new pumping schedule for Wells No. 6, 7, and 8. <br /> 3. The water supply well which No. 8 replaces. <br /> Please provide this information to our office by 17 September 1993. <br /> If you have any questions, please call me at (916) 255-3136. <br /> �4 <br /> ROBERT A. EVANS <br /> Project Engineer <br /> RAE <br /> cc: ,/Michael Hugginst San Joaquin bounty Public Heath Services, Stockton <br />
The URL can be used to link to this page
Your browser does not support the video tag.