My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WP0040701
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DELTA
>
8121
>
4200/4300 - Liquid Waste/Water Well Permits
>
WP0040701
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 2:31:45 PM
Creation date
5/14/2020 2:17:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
WP0040701
PE
4371
STREET_NUMBER
8121
Direction
W
STREET_NAME
DELTA
STREET_TYPE
AVE
City
TRACY
Zip
95304-
APN
21302003
ENTERED_DATE
4/2/2020 12:00:00 AM
SITE_LOCATION
8121 W DELTA AVE
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fox Loomis,Inc. <br /> 6901 McComber St. <br /> Sacramento,CA 95828 Calif. Contractor's License#372314 <br /> (916)383-2140, F(916)383-8021 Calif. DIR#1000005368 <br /> March 30,2020 <br /> San Joaquin County Environmental Health Department <br /> 1868 Hazelton Ave. <br /> Stockton,CA 95205 <br /> Dear Sir/Madam, <br /> Re: Work Plan,Subsurface Settlement Monitoring Points,Tracy WWTP Effluent Outfall Pipeline Improvement, <br /> Tracy,CA, Mozingo Job No. 1944, Fox Job No.917 <br /> The City of Tracy is constructing a new Outfall Pipeline. This work includes the construction of a tunnel at this <br /> location. They require 6 each Subsurface Settlement Monitoring Points to monitor the soils around the tunnel. <br /> Upon completion of this work. We will procure permits and destroy the Subsurface Settlement Monitoring Points. <br /> We propose constructing 6 each Subsurface Settlement Monitoring Points. <br /> SSMP 1 25'deep <br /> SSMP 2 50'deep <br /> SSMP 3 25'deep <br /> SSMP 4 25'deep <br /> SSMP 5 50'deep <br /> SSMP 6 25'deep <br /> We will construct the SSMP with the following method. <br /> 1. Procure permit for each SSMP. <br /> 2. Drill 8.5"bore hole the correct depth with the hollow stem method. <br /> 3. Place 3" PVC schedule 40 blank casing to grade. <br /> 4. Pump tremie place neat cement grout in the annular space between the blank casing and the <br /> bore hole full depth as the hollow stem augers are withdrawn from the borehole. <br /> 5. Place 1.5"steel settlement monitors in the 3" PVC casing with restraint chain. <br /> 6. Place 8" by 12" Monitoring Well surface vault over the top of the casing.The surface vault has a <br /> gasketed bolt down lid. <br /> 7. Construct concrete surface pad around the surface vault. <br /> Enclosed please find drawing for cross section and array. <br /> If you have any questions please call. <br /> Very Truly Yours, <br /> 0 <br /> Arnie Zwankhuz <br /> Enclosure <br />
The URL can be used to link to this page
Your browser does not support the video tag.