Laserfiche WebLink
Fox River Paper Company January 31,2007 <br /> Annual 2006 Summary Report Including 4th-Quarter 2006 Groundwater-Monitoring Results Page 2 Y3 <br /> Table 1 <br /> . Water ualit Protection Standards <br /> COC Send' erched A uifer U er A uifer Intermediate A uifer <br /> Bicarbonate 307 m /L 482 m /L 315 m /L <br /> Calcium 51 m 209 m m/L 49 /L <br /> Chloride 178 m 197 m /L 68 m /L <br /> Electrical Conductance 1242 mhos/cm 1580 mhos/cm 760 mhos/cm <br /> Magnesium 26 m /L 43 m /L 8.8 m /L <br /> Nitrate 4.3 m 4.7 mg5.7 m <br /> H 6.5-8.5 6.5-8.5 6.5-8.5 <br /> Potassium 2.6 m /L 10 m /L 6.8 m /L <br /> Sodium 184 m 89 m 100 m <br /> Sulfate 111 mo 150 m /L 31 m <br /> TDS 713 m 1030 m /L 470 m /L <br /> Corrective Action Implementation Schedule <br /> Corrective actions and their implementation schedules previously were submitted in L&A's <br /> • Amended Report of Waste Discharge For Disposal Of Plant Effluent Water dated June 15, <br /> 2005, and the subsequent Addendum To Amended Report of Waste Discharge For Disposal Of <br /> Plant Effluent Water dated March 31, 2006. The preferred corrective actions proposed in the <br /> documents were (1) the importation of South San Joaquin Irrigation District(SSJID) water to <br /> recharge the semiperched aquifer with low TDS water and (2) lining ASB 2 to prevent the <br /> infiltration of high TDS effluent water. Fox River is currently negotiating with the City of <br /> Ripon for the delivery of approximately 70 acre-feet of SSJID irrigation water; water delivery <br /> should begin during the 2007 irrigation season. <br /> Following the end of the 2007 irrigation season, L&A will evaluate what effects the <br /> application of SSJID water has had on groundwater quality and report findings in the fourth- <br /> quarter 2007/annual summary monitoring report. If groundwater quality has indeed improved <br /> to the degree anticipated, and FR's process water meets or exceeds newly adopted water <br /> quality protection standards for the semiperched aquifer(713 mg/L.TDS), then FR will re- <br /> evaluate whether or not there is a need to proceed with the lining of ASB-2. <br /> Certification Statement <br /> "I certify under penalty of law that I have personally examined and am familiar with the <br /> information submitted in this document and all attachments and that,based on my inquiry of <br /> those individuals immediately responsible for obtaining the information, I believe that the <br /> information is true, accurate, and complete. I am aware that there are significant penalties for <br /> submitting false information, including the possibility of fine and imprisonment." <br /> • <br />