My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
5000
>
2200 - Hazardous Waste Program
>
PR0513732
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 4:00:08 PM
Creation date
5/14/2020 3:17:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0513732
PE
2228
FACILITY_ID
FA0003907
FACILITY_NAME
PANELLA TRUCKING LLC
STREET_NUMBER
5000
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
14330001
CURRENT_STATUS
01
SITE_LOCATION
5000 E FREMONT ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tanknology Inc. <br /> 11000 N.MoPac Expressway, Suite 500 Austin,TX 78759(800)964-0010 Policy 100-29-B <br /> INSPECTOR ONLY Rev:A <br /> SAFETY CHECKLIST - OVF <br /> Site Name/#: Street Address: City,State,and Zipcode: W.O.# <br /> ADVANCED GEO EN PANELLA 5000 East Fremont Street Stockton,CA 95215 AST-6704145 <br /> Arrival Time: Departure Time: Travel Time: Others on site: Date: <br /> 8:22:00 AM PST 19:01:00 AM PST Dec 11,2019 <br /> Scope of Work and Tasks Performed(JSA's must be available for all tasks): <br /> 5 Year PE <br /> Repairs to Equipment or Parts Provided: <br /> Follow-up actions required;equipment isolated;comments: <br /> PPE-PERSONAL PROTECTIVE EQUIPMENT REQUIRED(Check items used or mark—if not applicable) <br /> 0 Safety Vest 0 Safety Glasses 0 Gloves ❑ Hearing Protection <br /> 0 Steel Toe Boots ❑ Splash Goggles ❑ Hard Hat ❑ Other <br /> PRE-TEST PROCEDURES (Check each item completed or mark- if not applicable) <br /> 1. 0 Discuss safety procedures with site personnel.Nearest hospital: <br /> 2. ❑ Prior to fuel deliveries the UST system must be placed back into working order. <br /> 3. ❑ Secure entire work area with barricades(cones,flags,and caution tape,pennant flags,or other perimeter guard). <br /> 4. ❑ Place fire extinguishers and"No Smoking"signs in the work area. <br /> SIGN IN Lead Technician Name Lead Technician Signature <br /> General Safety Checks: <br /> 0 All site personnel have been informed. Philip Thiel ow <br /> ❑ Fuel delivery has been informed. <br /> ❑ Work areas barricaded to protect workers,staff&public. Site Representative Name Site Representative Signature <br /> ❑ Is a fuel delivery due today? <br /> I have discussed job clearance form with technician. <br /> POST-TEST PROCEDURES (Check each item completed or mark- if not applicable) <br /> 1. ❑ Run all pumps and verify there are no leaks: <br /> ❑ Impact Valve Test Ports under dispensers ❑Leak Detector Threads on STP's ❑ Functional Elements&Relief Screws <br /> 2. Z Confirm location was returned to pre-arrival state <br /> 3. ❑ Remove barricades <br /> SIGN OUT&Operator Verification of Work(OVF) Lead Technician Name Lead Technician Signature <br /> General Safety Checks: <br /> ❑X Work area has been left tidy&safe Philip Thiel <br /> ❑ Site staff are aware of work status including any remaining isolation <br /> Site Representative Name Site Representative Signature <br /> ❑ Changes to equipment are documented and communicated <br /> ❑ All incidents,near incidents,and unsafe situations reported <br /> Site Representative Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.