My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002476
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MCKINLEY
>
19051
>
2600 - Land Use Program
>
UP-88-16
>
SU0002476
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2020 10:27:47 AM
Creation date
5/14/2020 4:06:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002476
PE
2626
FACILITY_NAME
UP-88-16
STREET_NUMBER
19051
Direction
S
STREET_NAME
MCKINLEY
City
MANTECA
Zip
95336
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
19051 S MCKINLEY
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UP-88-16 page 3 <br /> The site plan must be revised to conform to the use permit site <br /> plan check list (copy attached) . Because the site plan is part <br /> of the approved use permit, the plan must omit excavation notations <br /> of proposals that are unrelated to the uses noted above. The <br /> site plan identifies and existing house, but no permanent residence <br /> was observed in the recent on-site inspection. In addition to <br /> the other comments noted above, which will require site plan revi- <br /> sions , the site plan indicates that a future open ditch is proposed, <br /> but the plan does not indicate which aspects of the project propo- <br /> sals are related to the use of the ditch. The site plan should <br /> indicate the volumes of existing soil stock piles, and the time <br /> frames in which the soil would be removed. This information would <br /> allow the duration of coffee grounds importation to be coordinated <br /> with the depletion of soil stockpiles . <br /> EP-84-5 : <br /> The use of existing soil stockpiles for the soil amendment operation <br /> shall not be allowed if the soil is required to meed the reclamation <br /> requirements of EP-84-5 . The property owner will be given thirty <br /> days to complete site reclamation, until February 12 , 1988 . No <br /> Use Permit may be approved if the property owner does not provide <br /> documentation that the site conditions comply with EP-84-5 . The <br /> documentation must be prepared by a licensed Civil Engineer or <br /> Land Surveyor. Failure of the property owner to meet the compli- <br /> ance deadline will result in a zoning enforcement action against <br /> the property owner. <br /> HSI : jdh <br />
The URL can be used to link to this page
Your browser does not support the video tag.