Laserfiche WebLink
OPERATION CHARACTERISTICS <br /> Describe any processing to be done on-site: No actual processino done <br /> on site. <br /> List type of equipment or machinery used in the project and method <br /> of excavation: Scraper, water truck, motor grader, and loader (2 yard bucket) <br /> List equipment or processes used in this project that generate air <br /> pollutants or required an Air Pollution Control District permit : <br /> Exhaust emmissions typical of these 4 piorec of ediiinment will he �Pneratpd. <br /> This is not somethinc out of the ordinary_ <br /> List any operations which will cause noise or vibration: <br /> The only noise associated with this oradin4 excavation will come from the <br /> scraper, water truck, motor grader and the leader. <br /> Describe any trees or vegetation be removed: The deceased trees will <br /> be removed from the excavation area over a 5 vear period as shown on the <br /> Topographic map. <br /> List all noxious weeds on the site: None <br /> Where will materials be stockpiled: One stockpile is located on the <br /> eastern side of this site alone McKinie�, and a second stockpile is located <br /> in the eas;,ern half of this site as noied or the Dian. <br /> REHABILITATION PLAN <br /> Proposed final use of the site (crops, irrigation methods, etc. ) : <br /> Cattle arazinc and cattle feed lot with wood chip recvclinc as shown <br /> e <br /> on Dian. <br /> i OmaIDE was;.e ant !ne ccffee <br /> Will the topsoil be replaced? Yes F7 No Ex] grounds wi 11 be worked into the <br /> soil to enhance it's fertility. <br /> If no, attach a scils report prepared by a qualified soil scientist. <br /> Describe any changes in irrigation systems : See plan <br /> Describe measures to stabilize slopes : The proposed pasture grass will <br /> nrovide sufficient Sloop stabilization. <br /> Grading Excavation - 9 - (7/P4 ) <br />