Laserfiche WebLink
ATC Associates SITE SAFETY PLAN <br /> FACILITY BACKGROUND <br /> The facility contains one 2,000-gallon diesel UST, one 2,000-gallon gasoline UST, and one <br /> 550-gallon waste oil UST. All USTs were installed in 1985. <br /> WORK PLAN <br /> Supervise the advancement of two soil borings to 35 feet bgs. Two soil samples will <br /> be collected from each soil boring. Samples will be analyzed for TPHg (EPA <br /> method 8015), BTEX and MTBE (EPA method 8020), and TPHd (EPA method <br /> 8015). If MTBE is detected by method 8020, the sample will be analyzed by EPA <br /> method 8260 to confirm the results. <br /> PAGE <br />