My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SHAW
>
1113
>
2900 - Site Mitigation Program
>
PR0516823
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2020 8:52:29 AM
Creation date
5/15/2020 8:50:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516823
PE
2950
FACILITY_ID
FA0012833
FACILITY_NAME
BOBCAT CENTRAL INC
STREET_NUMBER
1113
STREET_NAME
SHAW
STREET_TYPE
RD
City
STOCKTON
Zip
952154081
APN
14327042
CURRENT_STATUS
01
SITE_LOCATION
1113 SHAW RD
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATC Associates Inc. <br /> Quality Assurance/Quality Control Plan <br /> Revised March 1998 <br /> 11.2 Sample Collection During Tank Removal <br /> Soil samples will be collected as soon as possible after removal of the tank. Where <br /> feasible, all preparations for soil sampling will be made prior to tank removal. Soil <br /> samples collected from a backhoe bucket or directly from the excavation floor will be <br /> collected in a thin-walled stainless steel or brass cylinder at least 3-inches long by 1-inch <br /> in diameter. From 3 to 24-inches of soil will be removed from the immediate surface <br /> area where the sample is to be taken and the cylinder will then be pounded into the soil <br /> with a wooden mallet, bulk density driver, or other decontaminated driving device. No <br /> headspace will be present in the cylinder once the sample is collected. Care will be taken <br /> to avoid contamination of both the inside and outside of the cylinder as well as its <br /> contents. During sampling, latex gloves will be worn to prevent cross-contamination with <br /> other samples. One pair of disposable gloves will be dedicated to each sample collected. <br /> Once the sample is collected, each end of the cylinder will be sealed with aluminum foil <br /> or teflon tape and then capped with a polyethylene lid, taped, and labeled. The sample <br /> will then be individually sealed in a ziplock bag and immediately placed in an ice chest <br /> containing dry ice or frozen chemical ice for delivery to a state certified laboratory. <br /> Sample identification, storage and transportation will be conducted as outlined in the <br /> previous section. <br /> 11.3 Sampling from Soil Piles or Shallow Soil Pits <br /> Soil samples will be collected and transported from excavated material in the manner <br /> described in the previous section, however, a backhoe will not be utilized. If composite <br /> W:\Admin\Shells\QAQC-98.D0C <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.