My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
205 (STATE ROUTE 205)
>
0
>
2900 - Site Mitigation Program
>
PR0517459
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 4:20:37 PM
Creation date
5/15/2020 8:58:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0517459
PE
2950
FACILITY_ID
FA0013437
FACILITY_NAME
CAL TRANS RIGHT OF WAY ROUTE 205
STREET_NUMBER
0
STREET_NAME
STATE ROUTE 205
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
I-205
P_LOCATION
03
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REPORT PREPARATION <br /> An Aerially Deposited Lead Site Investigation report for the 580/205 ADL Investigation Project will <br /> be prepared. The report will be prepared to transmit the field and laboratory data and data evaluation <br /> and will include but not be limited to the following-. <br /> - Executive.Summary <br /> - Background summary <br /> - Scope of services performed <br /> - Observations during the field activities <br /> - Results of field activities including laboratory results <br /> - Lead statistics if elevated levels of lead are detected <br /> - Vicinity Maps and Site Plans depicting boring locations <br /> - Conclusions and recommendations <br /> Appendices including laboratory reports and chain-of-custody documentation <br /> Caltrans will be provided with one, copy of each draft report. Vpon' receipt and incorporation of <br /> Caltrans continents, Geocon will provide two copies and one electronic copy of the finalized report. <br /> If there are any questions concerning the contents of this Workplan, or if Geocon may be of firrther <br /> service,please contact the undersigned at your convenience. <br /> Sincerely, <br /> GEOCON CONS ANTS, INC <br /> Matthew W. Hanko Richard W. Day, CEG, CHG <br /> Senior Project Scientist Regional Manager <br /> MWH:RWD:mvvh <br /> (1) Addressee <br /> Attachments: Figure 1, Vicinity Map <br /> Project No.E8100-06-03 -4- September 4,2001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.