My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STANISLAUS
>
0
>
2900 - Site Mitigation Program
>
PR0518598
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2020 9:06:51 AM
Creation date
5/15/2020 9:03:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0518598
PE
2950
FACILITY_ID
FA0013994
FACILITY_NAME
MONTE VISTA
STREET_NUMBER
0
Direction
S
STREET_NAME
STANISLAUS
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
149-200-10
CURRENT_STATUS
02
SITE_LOCATION
S STANISLAUS ST
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jul - 26. 2002 2: 47PM CP "R EARTH TECHNOLOGIES - No , 0586 P . 4/4 <br /> r Phase 13$nvirogtrttntal Site <br /> i <br /> Assessment Work plan <br /> APN 149-200-10,Stattislaus Street,Stockton,CA <br /> Pale 3 <br /> 3.4 LABORATORY ANALYSES <br /> The soil samples will be analyzed for TEPH and THY-G by EPA Method 8015,M, and for BTEX by EPA <br /> r <br /> Method 8020. The analytical methods and analytical detection limits are presented in Table 2. <br /> TABLE X Laboratory A;aalytical Methods <br /> CONSTrMENT METHOD DETIEC'nON LEWT <br /> Soil <br /> TEPH,TPH-G 8015M 0.05 mg/L <br /> BTEX 9020 0.5µell.(3,T,E); 1.0 gg/L(x) <br /> unk conversions: Analytical <br /> l.eL:parts per billion(ppb) TEPH=total extractable hydrocarbau quantified as kerosene,dind and motor oil <br /> m&tL:pare per million(ppm) TPH-G-to[al paroleam hydroea6ze,quantif cd a,g"Olhw <br /> BTEX.benzene,toluene,ethyl benzene,shd total xylenes. <br /> rk� 4.0 14EA)L,TII AND SAFETY PLAN <br /> Prior to commencement of fieldwork, a tailgate safety meeting will be held and a site-specific Health and <br /> h Safety Plan will be discussed with, and presented to,all field personnel for their signatures- <br /> 5.0 REPORTING <br /> Condor will prepare a Report of Findings to be submitted to Mr. Charles Holden of Monte Vista <br /> Entitlement, Inc. The roport will include a discussion of the field and laboratory procedures used to <br /> conduct the investigation, a discussion and presentation) of the analytical results and subsurface lithology, <br /> and recommendations. <br /> n 6.0 PROJECT SCHEDULE <br /> y Upon approval of this Work Plan by the EHD and notification by the client to proceed,the field portion <br /> of the investigation can be completed within approximately one week. The turn-around time for <br /> laboratory analyses is approximately one week. .A report can be submitted within one week of receipt of <br /> the laboratory analytical results. If you need additional information or have any questions, please call us <br /> at(209)234-0518. <br /> Respectfully subrnitt4 <br /> CONDOR EARTH TECHNOLOGIES,INC, ��Ri:D G 0 <br /> DAVID K. WOOD <br /> Micheline Doyle Kipf David K. Mood <br /> Ha. 6532 <br /> Staff Geologist California Registered Geologist# <br /> P:13640 Monte Vista Entitlement,hte14.0 Coutractsllrnv Assessment Work Plan 7-23-02.doc <br /> 6,11111CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.