Laserfiche WebLink
Baker, Lydia <br /> From: Mike Ubick <mubick@PACIFIC.EDU> <br /> Sent: Tuesday, April 21, 2020 11:50 AM <br /> To: Baker, Lydia <br /> Subject: Pacific - Closeout on #301 <br /> Attachments: #301 closeout - Engineering Shop pics.pdf <br /> Lydia: <br /> One of my contacts onsite was able to get pictures confirming that the Engineering Shop floor(from #301)was cleaned <br /> after the machine was removed. Attached are the pictures. Thank you. <br /> Mike Ubick, CSP, RSO <br /> Assistant Director, Environmental Health and Safety <br /> Enterprise Risk Management, Division of Business & Finance <br /> UNIVY;R51TY Of THE <br /> PACIFIC <br /> 3601 Pacific Avenue Stockton, CA 95211 <br /> phone. 209.946.7645 ERM main line. 209.932.3011 1 fax 209.954.2806 <br /> email: mubick@pacific.edu <br /> From: Baker, Lydia <Ibaker@sjgov.org> <br /> Sent: Friday, April 3, 2020 4:04 PM <br /> To: Mike Ubick<mubick@PACIFIC.EDU> <br /> Subject: Return to Compliance-3601 Pacific Avenue <br /> Hello Mike, <br /> I am following up on the RTC for UOP main campus. There are still 7 open violations remaining. Here is what I need to <br /> close out those violations (I've included the corrected by dates since some have not come yet): <br /> #102-(Completion date provided: 2/28/2020) Please provide a copy of the transformer oil analytical & hazardous waste <br /> determination <br /> -What happened to the refrigerant that was removed from the mini-fridge? <br /> -Please provide the analytical & hazardous waste determination for the metal fines <br /> #104-(Completion date provided:4/30/2020) Please provide a copy of the source reduction plan <br /> #118-(Completion date provided: 3/31/2020) Please provide a roster and syllabus demonstrating that relevant <br /> hazardous waste training has been received by all applicable employees <br /> #208-(Completion date provided: 3/31/2020) Please provide a roster and syllabus demonstrating that individuals <br /> performing treatment in the lab have been properly trained <br /> #301-(Completion date provided: 12/31/2019) Please provide a statement and/or supporting documentation that the <br /> milling machine is not leaking oil anymore <br /> i <br />