My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BLACK DIAMOND
>
927
>
2200 - Hazardous Waste Program
>
PR0513924
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2020 1:37:43 PM
Creation date
5/15/2020 10:39:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0513924
PE
2227
FACILITY_ID
FA0003775
FACILITY_NAME
TIGER LINES INC
STREET_NUMBER
927
Direction
E
STREET_NAME
BLACK DIAMOND
STREET_TYPE
WAY
City
LODI
Zip
95240
APN
04903033
CURRENT_STATUS
01
SITE_LOCATION
927 E BLACK DIAMOND WAY
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.5 All foreign materials shall be removed from the surface of the tank. <br /> 2.6 The primary tank exterior shall be painted with 1 coat of shop primer. <br /> 2.7 The tank shall have a minimum of two (2) support feet. <br /> 3.0 SECONDARY CONTAINMENT TANK(DOUBLE WALL TANKS) <br /> 3.1 The secondary containment tank shall be rectangular in design. <br /> 3.2 The welds shall be continuous. <br /> 3.3 The secondary containment tank shall be listed by Underwriters Laboratories as secondary <br /> containment under UL 142 standard. <br /> 3.4 The secondary containment tank shall provide a minimum of 110% secondary containment. <br /> 3.5 The secondary containment tank shall be equipped with a 2 inch monitoring port and a 4", 6", <br /> 8", or 10" emergency vent port as required by Underwriters Laboratories, Inc. <br /> 3.5 The secondary containment tank exterior and that portion of the exposed primary tank shall <br /> be painted with 1 coat of shop primer. <br /> 3.6 The secondary containment tank shall be pressure tested in the factory to UL 142 <br /> specification (3 PSI). <br /> Litho In U.S.A., Sept.1998 Copyright 1998 containment Solutions,Inc.-All Rights Reserved Pub.No.LC3501 <br />
The URL can be used to link to this page
Your browser does not support the video tag.